Servicescape refers to the physical surrounding in which the service is delivered.

(True/False)
5.0/5
(42)

A(n)________ groups workers,their equipment,and spaces/offices to provide for comfort,safety,and movement of information.

(Essay)
4.8/5
(33)

A manufacturing work cell has a takt time of 7 minutes.Exactly 10 workers are required.Suppose that the work cell delivers 68 units each day. (a)What is the total operation time? (b)What is the amount of time worked during the day for all 10 workers combined? (c)If the plant is open for only 8 hours per day,can the staff meet demand?

(Essay)
4.9/5
(35)

The major problem addressed by the process-oriented layout strategy is:

(Multiple Choice)
4.9/5
(36)

Which of the following does NOT support the retail layout objective of maximizing customer exposure to products?

(Multiple Choice)
4.9/5
(37)

One guideline for determining the arrangement and space allocation of a retail store is to place high-impulse and high-margin items in prominent locations.

(True/False)
4.9/5
(38)

If the schedule calls for the production of 120 units per day and 480 minutes of production time are available per day,the cycle time would be 4 minutes.

(True/False)
4.9/5
(38)

You have been asked to balance a flow shop assembly operation to achieve an output rate of 80 units per eight-hour day.Task times and precedence relationships are shown in the table below. You have been asked to balance a flow shop assembly operation to achieve an output rate of 80 units per eight-hour day.Task times and precedence relationships are shown in the table below.    a.Draw the precedence diagram. b.Determine the desired cycle time. c.Determine the theoretical minimum number of stations needed. d.Balance this line using the most following tasks heuristic. e.What is the efficiency of the line obtained in part d? a.Draw the precedence diagram. b.Determine the desired cycle time. c.Determine the theoretical minimum number of stations needed. d.Balance this line using the most following tasks heuristic. e.What is the efficiency of the line obtained in part d?

(Essay)
4.8/5
(45)

Which one of the following is NOT common to repetitive and product-oriented layouts?

(Multiple Choice)
4.7/5
(29)

An assembly line with 11 tasks is to be balanced.The longest task is 2.4 minutes,the shortest task is 0.4 minutes,and the sum of the task times is 18 minutes.The line will operate for 600 minutes per day. (a)Determine the minimum and maximum cycle times. (b)What range of output is theoretically possible for the line? (c)What is the minimum number of stations needed if the maximum output rate is to be sought? (d)What cycle time will provide an output rate of 200 units per day?

(Essay)
4.9/5
(27)

Process-oriented layouts typically have low levels of work-in-process inventory.

(True/False)
5.0/5
(34)

Mathematically,takt time is:

(Multiple Choice)
4.8/5
(41)

________ is the maximum time that the product is allowed at each workstation.

(Essay)
4.8/5
(42)

The typical goal used when developing a process-oriented layout strategy is to:

(Multiple Choice)
4.8/5
(48)

The minimum number of workstations depends upon the set of task times and the precedence chart,but not the number of units scheduled.

(True/False)
4.8/5
(40)

To develop a good facility layout,what must be determined?

(Essay)
4.9/5
(40)

Which of the following is NOT one of the factors complicating the techniques for addressing the fixed-position layout?

(Multiple Choice)
4.8/5
(37)

One of the major advantages of process-oriented layouts is:

(Multiple Choice)
4.7/5
(41)

The objective of layout strategy is to:

(Multiple Choice)
4.7/5
(31)

Identify the seven fundamental layout strategies.Describe the use of each one very briefly.

(Essay)
4.9/5
(38)