Exam 9: Layout Decisions
Exam 1: Operations and Productivity127 Questions
Exam 2: The Global Environment and Operations Strategy119 Questions
Exam 3: Managing Projects120 Questions
Exam 4: Forecasting Demand140 Questions
Exam 5: Product Design118 Questions
Exam 6: Quality Management and International Standards123 Questions
Exam 7: Process Design108 Questions
Exam 8: Location Decisions121 Questions
Exam 9: Layout Decisions146 Questions
Exam 10: Job Design and Work Measurement154 Questions
Exam 11: Supply Chain Management145 Questions
Exam 12: Managing Inventory163 Questions
Exam 13: Aggregate Scheduling116 Questions
Exam 14: Material Requirements Planning Mrpand Erp113 Questions
Exam 15: Scheduling for the Short-Term116 Questions
Exam 16: Jit,lean Operations,and the Toyota Production System115 Questions
Exam 17: Maintenance and Reliability Decisions111 Questions
Exam 18: Sustainability80 Questions
Exam 19: Statistical Process Control144 Questions
Exam 20: Capacity Planning96 Questions
Exam 21: Supply Chain Modeling55 Questions
Exam 22: Decision Modeling97 Questions
Exam 23: Linear Programming Models88 Questions
Exam 24: Transportation Modeling89 Questions
Exam 25: Queuing Models119 Questions
Exam 26: Learning Curves110 Questions
Exam 27: Modeling with Simulation75 Questions
Select questions type
Balancing low-cost storage with low-cost material handling is important in which of the following?
(Multiple Choice)
4.8/5
(26)
Explain how a load-distance model helps solve problems in process layout.
(Essay)
4.9/5
(27)
The project remains in one place and workers and equipment come to that one work area in a(n)________ layout.
(Essay)
4.7/5
(35)
An assembly line consists of 158 tasks grouped into 32 workstations.The sum of all task times is 105 minutes.The largest assigned cycle time is 4 minutes.What is the efficiency of this line?
(Multiple Choice)
4.8/5
(33)
Which of the following is NOT one of the requirements of cellular production?
(Multiple Choice)
4.8/5
(39)
The central problem in product-oriented layout planning is:
(Multiple Choice)
4.8/5
(37)
Ambient conditions;spatial layout and functionality;and signs,symbols,and artifacts are all:
(Multiple Choice)
4.9/5
(42)
The major problem addressed by the warehouse layout strategy is:
(Multiple Choice)
4.8/5
(40)
The fixed-position layout would be MOST appropriate in which of the following settings?
(Multiple Choice)
4.9/5
(35)
A firm is planning to set up an assembly line to assemble 40 units per hour,and 57 minutes per hour are productive.The time to perform each task and the tasks that precede each task are contained in the following table.
(a)Draw a network diagram of precedence relationships.
(b)Compute the required cycle time per unit in minutes.
(c)Compute the theoretical minimum number of workstations required to produce 40 units per hour.
(d)Balance this line using the longest processing time heuristic.
(e)What is the efficiency of the line obtained in part d?

(Essay)
4.8/5
(36)
Departments A,B,C,and D need to be assigned to four rooms 1,2,3,and 4.These rooms are arranged in a row,in that order,with 20 meters between each.The departmental work flows are contained in the table below.
(a)What is the material handling total of assigning A-1,B-2,C-3,D-4?
(b)What is the material handling total of assigning A-1,B-3,C-4,D-2?


(Essay)
4.7/5
(38)
In assembly-line balancing,the theoretical minimum number of workstations is:
(Multiple Choice)
4.8/5
(46)
A work cell is required to make 140 computerized diagnostic assemblies (for installation into hybrid automobiles)each day.The cell currently works an eight hour shift,of which seven hours is available for productive work.These assemblies require five operations.Standard times for these operations are: Operation A,3.0 minutes,B,1.8 minutes,C,2.4 minutes,D,2.5 minutes,and E,1.4 minutes.
(a)What is takt time for this cell?
(b)How many workers will be needed to achieve this schedule?
(Essay)
4.7/5
(37)
________ is the use of computer software to evaluate the profitability of merchandising plans in a retail layout.
(Essay)
4.9/5
(38)
The ________ uses non-numeric "closeness" ratings to determine which departments should be located near one another and which departments should be kept farther apart.
(Essay)
4.7/5
(41)
Showing 81 - 100 of 146
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)