Exam 9: Layout Decisions
Exam 1: Operations and Productivity127 Questions
Exam 2: The Global Environment and Operations Strategy119 Questions
Exam 3: Managing Projects120 Questions
Exam 4: Forecasting Demand140 Questions
Exam 5: Product Design118 Questions
Exam 6: Quality Management and International Standards123 Questions
Exam 7: Process Design108 Questions
Exam 8: Location Decisions121 Questions
Exam 9: Layout Decisions146 Questions
Exam 10: Job Design and Work Measurement154 Questions
Exam 11: Supply Chain Management145 Questions
Exam 12: Managing Inventory163 Questions
Exam 13: Aggregate Scheduling116 Questions
Exam 14: Material Requirements Planning Mrpand Erp113 Questions
Exam 15: Scheduling for the Short-Term116 Questions
Exam 16: Jit,lean Operations,and the Toyota Production System115 Questions
Exam 17: Maintenance and Reliability Decisions111 Questions
Exam 18: Sustainability80 Questions
Exam 19: Statistical Process Control144 Questions
Exam 20: Capacity Planning96 Questions
Exam 21: Supply Chain Modeling55 Questions
Exam 22: Decision Modeling97 Questions
Exam 23: Linear Programming Models88 Questions
Exam 24: Transportation Modeling89 Questions
Exam 25: Queuing Models119 Questions
Exam 26: Learning Curves110 Questions
Exam 27: Modeling with Simulation75 Questions
Select questions type
Product-oriented layouts tend to have high levels of work-in-process inventories.
(True/False)
4.7/5
(34)
Heuristics are problem-solving procedures that mathematically optimize the solution.
(True/False)
4.9/5
(39)
A focused work center is well suited to the production of a large family of products requiring similar processing,even if their demands are not very stable.
(True/False)
4.8/5
(39)
The ________ layout's main objective is to equalize the task time for each station.
(Multiple Choice)
4.9/5
(33)
A(n)________ line is a machine-paced product-oriented facility for building components.
(Essay)
4.8/5
(48)
A production line is to be designed for a job with four tasks.The task times are 2.4 minutes,1.4 minutes,0.9 minutes,and 1.7 minutes.After line balancing,the largest possible assigned cycle time is ________ minutes,and the smallest possible assigned cycle time is ________ minutes.
(Multiple Choice)
4.7/5
(40)
Explain what the purpose of assembly-line balancing is.Describe briefly how it is done.
(Essay)
4.8/5
(48)
An insurance claims processing center has six work centers,any of which can be placed into any of six physical departmental locations.Call the centers 1,2,3,4,5,and 6,and the departments A,B,C,D,E,and F.The current set of assignments is A-3,B-1,C-6,D-2,E-4,and F-5.
The (symmetric)matrix of departmental distances,in meters is shown below.
The matrix of work flow (estimated trips per day)is among centers is shown below.
The firm estimates that each trip costs approximately $4.What is the cost of the current assignment?


(Essay)
4.7/5
(33)
Cyclone Appliances has developed a new European-style convection oven that will be made on an assembly line.The schedule requires 80 ovens in an 8-hour day.The assembly includes seven tasks.The table below indicates the performance time and the sequence requirements for each task.
(a)What is the cycle time for this assembly operation?
(b)What is the theoretical minimum number of workstations?
(c)Draw the precedence diagram.

(Essay)
4.8/5
(38)
What are the advantages and disadvantages of product-oriented layouts?
(Essay)
4.9/5
(34)
Which of the following is a disadvantage of product-oriented layout?
(Multiple Choice)
4.9/5
(37)
A hospital's layout most closely resembles which of the following?
(Multiple Choice)
4.8/5
(32)
________ refers to the physical surroundings in which a service takes place,and how they affect customers and employees.
(Essay)
4.8/5
(30)
A firm operates a flow shop building kitchen cabinetry for recreational vehicles.The major activities of this process are listed below.
a.Draw the appropriate network for this project.
b.What would the cycle time be if the goal is to produce 20 units per month (the plant operates
160 hours per month)?
c.What is the theoretical minimum number of workstations needed?
d.Balance with the most following tasks heuristic.What tasks are assigned to which stations?
e.What is the efficiency of the line obtained in part d?

(Essay)
4.8/5
(29)
An assembly line consists of 21 tasks grouped into 5 workstations.The sum of the 21 task times is 85 minutes.The largest assigned cycle time is 20 minutes.What is the efficiency of this line?
(Multiple Choice)
4.9/5
(29)
Which of the following is NOT one of McDonald's "seven major innovations"?
(Multiple Choice)
4.8/5
(32)
Solving a load-distance problem for a process-oriented layout requires that:
(Multiple Choice)
4.8/5
(38)
Showing 61 - 80 of 146
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)