Exam 9: Layout Decisions

arrow
  • Select Tags
search iconSearch Question
  • Select Tags

A good layout requires determining:

(Multiple Choice)
4.9/5
(43)

Product-oriented layouts tend to have high levels of work-in-process inventories.

(True/False)
4.7/5
(34)

Heuristics are problem-solving procedures that mathematically optimize the solution.

(True/False)
4.9/5
(39)

A focused work center is well suited to the production of a large family of products requiring similar processing,even if their demands are not very stable.

(True/False)
4.8/5
(39)

The ________ layout's main objective is to equalize the task time for each station.

(Multiple Choice)
4.9/5
(33)

A(n)________ line is a machine-paced product-oriented facility for building components.

(Essay)
4.8/5
(48)

A production line is to be designed for a job with four tasks.The task times are 2.4 minutes,1.4 minutes,0.9 minutes,and 1.7 minutes.After line balancing,the largest possible assigned cycle time is ________ minutes,and the smallest possible assigned cycle time is ________ minutes.

(Multiple Choice)
4.7/5
(40)

Which of the following is TRUE of random stocking?

(Multiple Choice)
4.9/5
(41)

Explain what the purpose of assembly-line balancing is.Describe briefly how it is done.

(Essay)
4.8/5
(48)

An insurance claims processing center has six work centers,any of which can be placed into any of six physical departmental locations.Call the centers 1,2,3,4,5,and 6,and the departments A,B,C,D,E,and F.The current set of assignments is A-3,B-1,C-6,D-2,E-4,and F-5. The (symmetric)matrix of departmental distances,in meters is shown below. An insurance claims processing center has six work centers,any of which can be placed into any of six physical departmental locations.Call the centers 1,2,3,4,5,and 6,and the departments A,B,C,D,E,and F.The current set of assignments is A-3,B-1,C-6,D-2,E-4,and F-5. The (symmetric)matrix of departmental distances,in meters is shown below.    The matrix of work flow (estimated trips per day)is among centers is shown below.    The firm estimates that each trip costs approximately $4.What is the cost of the current assignment? The matrix of work flow (estimated trips per day)is among centers is shown below. An insurance claims processing center has six work centers,any of which can be placed into any of six physical departmental locations.Call the centers 1,2,3,4,5,and 6,and the departments A,B,C,D,E,and F.The current set of assignments is A-3,B-1,C-6,D-2,E-4,and F-5. The (symmetric)matrix of departmental distances,in meters is shown below.    The matrix of work flow (estimated trips per day)is among centers is shown below.    The firm estimates that each trip costs approximately $4.What is the cost of the current assignment? The firm estimates that each trip costs approximately $4.What is the cost of the current assignment?

(Essay)
4.7/5
(33)

Cyclone Appliances has developed a new European-style convection oven that will be made on an assembly line.The schedule requires 80 ovens in an 8-hour day.The assembly includes seven tasks.The table below indicates the performance time and the sequence requirements for each task. Cyclone Appliances has developed a new European-style convection oven that will be made on an assembly line.The schedule requires 80 ovens in an 8-hour day.The assembly includes seven tasks.The table below indicates the performance time and the sequence requirements for each task.    (a)What is the cycle time for this assembly operation? (b)What is the theoretical minimum number of workstations? (c)Draw the precedence diagram. (a)What is the cycle time for this assembly operation? (b)What is the theoretical minimum number of workstations? (c)Draw the precedence diagram.

(Essay)
4.8/5
(38)

What are the advantages and disadvantages of product-oriented layouts?

(Essay)
4.9/5
(34)

Which of the following is a disadvantage of product-oriented layout?

(Multiple Choice)
4.9/5
(37)

A hospital's layout most closely resembles which of the following?

(Multiple Choice)
4.8/5
(32)

________ refers to the physical surroundings in which a service takes place,and how they affect customers and employees.

(Essay)
4.8/5
(30)

A firm operates a flow shop building kitchen cabinetry for recreational vehicles.The major activities of this process are listed below. A firm operates a flow shop building kitchen cabinetry for recreational vehicles.The major activities of this process are listed below.    a.Draw the appropriate network for this project. b.What would the cycle time be if the goal is to produce 20 units per month (the plant operates 160 hours per month)? c.What is the theoretical minimum number of workstations needed? d.Balance with the most following tasks heuristic.What tasks are assigned to which stations? e.What is the efficiency of the line obtained in part d? a.Draw the appropriate network for this project. b.What would the cycle time be if the goal is to produce 20 units per month (the plant operates 160 hours per month)? c.What is the theoretical minimum number of workstations needed? d.Balance with the most following tasks heuristic.What tasks are assigned to which stations? e.What is the efficiency of the line obtained in part d?

(Essay)
4.8/5
(29)

An assembly line consists of 21 tasks grouped into 5 workstations.The sum of the 21 task times is 85 minutes.The largest assigned cycle time is 20 minutes.What is the efficiency of this line?

(Multiple Choice)
4.9/5
(29)

Which of the following is NOT one of McDonald's "seven major innovations"?

(Multiple Choice)
4.8/5
(32)

The concept of customizing in a warehouse layout:

(Multiple Choice)
4.8/5
(39)

Solving a load-distance problem for a process-oriented layout requires that:

(Multiple Choice)
4.8/5
(38)
Showing 61 - 80 of 146
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)