Exam 19: Statistical Process Control
Exam 1: Operations and Productivity127 Questions
Exam 2: The Global Environment and Operations Strategy119 Questions
Exam 3: Managing Projects120 Questions
Exam 4: Forecasting Demand140 Questions
Exam 5: Product Design118 Questions
Exam 6: Quality Management and International Standards123 Questions
Exam 7: Process Design108 Questions
Exam 8: Location Decisions121 Questions
Exam 9: Layout Decisions146 Questions
Exam 10: Job Design and Work Measurement154 Questions
Exam 11: Supply Chain Management145 Questions
Exam 12: Managing Inventory163 Questions
Exam 13: Aggregate Scheduling116 Questions
Exam 14: Material Requirements Planning Mrpand Erp113 Questions
Exam 15: Scheduling for the Short-Term116 Questions
Exam 16: Jit,lean Operations,and the Toyota Production System115 Questions
Exam 17: Maintenance and Reliability Decisions111 Questions
Exam 18: Sustainability80 Questions
Exam 19: Statistical Process Control144 Questions
Exam 20: Capacity Planning96 Questions
Exam 21: Supply Chain Modeling55 Questions
Exam 22: Decision Modeling97 Questions
Exam 23: Linear Programming Models88 Questions
Exam 24: Transportation Modeling89 Questions
Exam 25: Queuing Models119 Questions
Exam 26: Learning Curves110 Questions
Exam 27: Modeling with Simulation75 Questions
Select questions type
A process range chart illustrates the amount of dispersion within the samples.
(True/False)
5.0/5
(38)
A manager wants to build 3-sigma x-bar control limits for a process.The target value for the mean of the process is 10 units,and the standard deviation of the process is 6.If samples of size 9 are to be taken,what will be the upper and lower control limits,respectively?
(Multiple Choice)
4.9/5
(37)
An operator trainee is attempting to monitor a filling process that has an overall average of 705 cc.The average range is 17 cc.If you use a sample size of 6,what are the upper and lower control limits for the x-bar chart and R-chart?
(Essay)
4.8/5
(27)
Pierre's Motorized Pirogues and Mudboats is setting up an acceptance sampling plan for the special air cleaners he manufactures for his boats.His specifications,and the resulting plan,are shown on the POM for Windows output below.Pierre wants acceptance sampling to remove ALL defects from his production of air cleaners.Explain carefully why this won't happen. 

(Essay)
4.8/5
(41)
In acceptance sampling,a manager can reach the wrong conclusion if the sample is not representative of the population it was drawn from.
(True/False)
4.8/5
(42)
A nationwide parcel delivery service keeps track of the number of late deliveries (more than 30 minutes past the time promised to clients)per day.They plan on using a control chart to plot their results.Which type of control chart(s)would you recommend?
(Multiple Choice)
4.8/5
(38)
Plots of sample ranges indicate that the most recent value is below the lower control limit.What course of action would you recommend?
(Multiple Choice)
4.8/5
(32)
A retail store manager is trying to improve and control the rate at which cashiers sign customers up
for store credit cards.Suppose the manager takes 10 samples,each with 100 observations.The p-bar
value is found to be .05,and the manager does not want a lower limit below .0064.What z-value would this imply,and how confident can she be that the true lower limit is greater than or equal to .0064?
(Essay)
4.8/5
(42)
The Cpk index measures the difference between the desired and actual dimensions of goods or services produced.
(True/False)
4.9/5
(44)
Define consumer's risk.Is it a Type I or Type II error? What is the symbol for its value?
(Essay)
4.9/5
(41)
Red Top Cab Company receives multiple complaints per day about driver behavior.Over 9 days the owner recorded the number of calls to be 3,0,8,9,6,7,4,9,and 8.What is the upper control limit for the 3-sigma c-chart?
(Multiple Choice)
4.8/5
(38)
If a sample of items is taken and the mean of the sample is outside the control limits,the process is:
(Multiple Choice)
4.7/5
(38)
Which of the following is TRUE regarding the average outgoing quality level?
(Multiple Choice)
4.9/5
(46)
The number of defects after a hotel room cleaning (sheets not straight,smears on mirror,missed debris on carpet,etc)should be measured using what type of control chart?
(Multiple Choice)
4.9/5
(49)
The process capability measures Cp and Cpk differ because:
(Multiple Choice)
4.8/5
(34)
Showing 101 - 120 of 144
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)