Exam 12: Resource Planning
Exam 1: Creating Customer Value through Operations128 Questions
Exam 2: Supply Chain Management171 Questions
Exam 3: Process Configuration137 Questions
Exam 4: Capacity145 Questions
Exam 5: Inventory Management177 Questions
Exam 6: Quality and Process Improvement240 Questions
Exam 7: Lean Systems158 Questions
Exam 8: Managing Projects153 Questions
Exam 9: Location and Layout217 Questions
Exam 10: Managing Demand and Forecasting189 Questions
Exam 11: Operations Planning and Scheduling138 Questions
Exam 12: Resource Planning174 Questions
Exam 13: Decision Making82 Questions
Exam 14: Financial Analysis41 Questions
Exam 15: Work Measurement98 Questions
Exam 16: Learning Curve Analysis44 Questions
Exam 17: Computer-Integrated Manufacturing53 Questions
Exam 18: Acceptance Sampling Plans71 Questions
Exam 19: Simulation36 Questions
Exam 20: Special Inventory Models33 Questions
Exam 21: Linear Programming57 Questions
Exam 22: Waiting Lines109 Questions
Select questions type
Table 13.5
-Use the information in Table 13.5.Which of the statements concerning item RST is TRUE? (Examine each answer independently.)

(Multiple Choice)
4.8/5
(29)
Service providers must plan for the same resources as in the manufacturing company having demand material driven.
(True/False)
4.8/5
(39)
A technique for projecting time-phased requirements for critical workstations is a definition of
(Multiple Choice)
4.8/5
(35)
________ is a lot-sizing rule that allows a different order quantity for each order issued but tends to issue the order at predetermined time intervals.
(Short Answer)
4.7/5
(35)
A(n)________ process that takes sales and operations plans; processes information in the way of time standards,routings,and other information on how the firm produces its services or products; and then plans the input requirements.
(Short Answer)
4.8/5
(38)
The ________ is a record of all components of an item,the parent-component relationships,and usage quantities derived from engineering and process design.
(Short Answer)
4.9/5
(42)
________ ties the basic MRP system to the company's financial system.
(Short Answer)
4.8/5
(41)
Which one of the following systems is an input to the MRP system?
(Multiple Choice)
4.8/5
(34)
Table 13.2
-Use the following MRP record to answer the question.
How many action notices are needed for item A?


(Multiple Choice)
5.0/5
(41)
Gross requirements are the total demand derived from all parent production plans.
(True/False)
4.7/5
(38)
The bill of materials is a record of all the components of an item,the parent-component relationships,and usage quantities derived from engineering and process designs.
(True/False)
4.8/5
(38)
In an MRP system,a(n)________ item has at least one parent and at least one component.
(Short Answer)
4.8/5
(36)
In an MRP system,from what sources are an item's gross requirements derived?
(Essay)
4.8/5
(39)
Discuss both the advantages and disadvantages of using an MRP system,which when working,allows a firm to react to even minor changes in production requirements.
(Essay)
5.0/5
(44)
Only very accurate lot sizes are calculated in advance can MRP be effective.
(True/False)
4.8/5
(40)
Which of the following statements about Enterprise Resource Planning (ERP)is TRUE?
(Multiple Choice)
4.9/5
(49)
Showing 81 - 100 of 174
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)