Exam 12: Resource Planning

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The purpose of Finite Capacity Scheduling is to

(Multiple Choice)
4.8/5
(38)

Table 13.5 Table 13.5    -Use the information in Table 13.5.Which of the statements concerning item RST is TRUE? (Examine each answer independently.) -Use the information in Table 13.5.Which of the statements concerning item RST is TRUE? (Examine each answer independently.)

(Multiple Choice)
4.8/5
(29)

Service providers must plan for the same resources as in the manufacturing company having demand material driven.

(True/False)
4.8/5
(39)

Complete the following MRP schedule: Complete the following MRP schedule:

(Essay)
4.9/5
(34)

A technique for projecting time-phased requirements for critical workstations is a definition of

(Multiple Choice)
4.8/5
(35)

________ is a lot-sizing rule that allows a different order quantity for each order issued but tends to issue the order at predetermined time intervals.

(Short Answer)
4.7/5
(35)

A(n)________ process that takes sales and operations plans; processes information in the way of time standards,routings,and other information on how the firm produces its services or products; and then plans the input requirements.

(Short Answer)
4.8/5
(38)

The ________ is a record of all components of an item,the parent-component relationships,and usage quantities derived from engineering and process design.

(Short Answer)
4.9/5
(42)

________ ties the basic MRP system to the company's financial system.

(Short Answer)
4.8/5
(41)

Which of the following statements on MRP is TRUE?

(Multiple Choice)
4.9/5
(40)

Which one of the following systems is an input to the MRP system?

(Multiple Choice)
4.8/5
(34)

Table 13.2 Table 13.2    -Use the following MRP record to answer the question.   How many action notices are needed for item A? -Use the following MRP record to answer the question. Table 13.2    -Use the following MRP record to answer the question.   How many action notices are needed for item A? How many action notices are needed for item A?

(Multiple Choice)
5.0/5
(41)

Gross requirements are the total demand derived from all parent production plans.

(True/False)
4.7/5
(38)

The bill of materials is a record of all the components of an item,the parent-component relationships,and usage quantities derived from engineering and process designs.

(True/False)
4.8/5
(38)

In an MRP system,a(n)________ item has at least one parent and at least one component.

(Short Answer)
4.8/5
(36)

In an MRP system,from what sources are an item's gross requirements derived?

(Essay)
4.8/5
(39)

Discuss both the advantages and disadvantages of using an MRP system,which when working,allows a firm to react to even minor changes in production requirements.

(Essay)
5.0/5
(44)

Only very accurate lot sizes are calculated in advance can MRP be effective.

(True/False)
4.8/5
(40)

Which of the following statements about Enterprise Resource Planning (ERP)is TRUE?

(Multiple Choice)
4.9/5
(49)

Discuss planning lead time for inventory and manufacturers.

(Essay)
4.9/5
(35)
Showing 81 - 100 of 174