Exam 12: Resource Planning
Exam 1: Creating Customer Value through Operations128 Questions
Exam 2: Supply Chain Management171 Questions
Exam 3: Process Configuration137 Questions
Exam 4: Capacity145 Questions
Exam 5: Inventory Management177 Questions
Exam 6: Quality and Process Improvement240 Questions
Exam 7: Lean Systems158 Questions
Exam 8: Managing Projects153 Questions
Exam 9: Location and Layout217 Questions
Exam 10: Managing Demand and Forecasting189 Questions
Exam 11: Operations Planning and Scheduling138 Questions
Exam 12: Resource Planning174 Questions
Exam 13: Decision Making82 Questions
Exam 14: Financial Analysis41 Questions
Exam 15: Work Measurement98 Questions
Exam 16: Learning Curve Analysis44 Questions
Exam 17: Computer-Integrated Manufacturing53 Questions
Exam 18: Acceptance Sampling Plans71 Questions
Exam 19: Simulation36 Questions
Exam 20: Special Inventory Models33 Questions
Exam 21: Linear Programming57 Questions
Exam 22: Waiting Lines109 Questions
Select questions type
Table 13.7
-Use the information from Table 13.7.Which lot sizing rule results in the highest average inventory?

(Multiple Choice)
4.8/5
(37)
The master production schedule is part of the material requirements plan that specifies how many end items will be produced within specified periods of time.
(True/False)
5.0/5
(28)
________ is an algorithm designed to schedule a group of orders appropriately across an entire shop.
(Short Answer)
4.8/5
(39)
Which one of the following statements about lot-sizing rules is TRUE?
(Multiple Choice)
4.8/5
(40)
In MRP,the inventory record divides the future into time periods called time baskets.
(True/False)
4.9/5
(45)
Table 13.4
Consider the MPS, BOM and inventory data shown below. Master Production Schedule: the following table shows the MPS start quantities.
Week
Week 1 2 3 4 5 6 MPS 80 80
Bill of Material
-Item A uses 1 each of component D, 2 each of component C and 2 each of subassembly B.
-Subassembly B uses 1 each of component D.
Selected Inventory Data
Item
Data Category B Lot-sizing rule LAL OQ=180 (=2) Lead time (wks) 1 1 2 Beginning (on-hand) 30 160 50 inventory 190 (wk 2) 180( wk 11) 80( wk 1) Scheduled receipts
-Use the information in Table 13.4.When does the first planned order release for item C occur?
(Multiple Choice)
4.8/5
(41)
Which one of the following is an MRP lot-sizing rule that attempts to minimize the amount of average inventory?
(Multiple Choice)
4.9/5
(37)
The ________ rule is a special case of the periodic order quantity (POQ)rule where the lot size ordered covers the gross requirements of a single time period (e.g.one week).
(Short Answer)
4.8/5
(31)
Julius testing: Dependent demand occurs because the quantity required is a function of the demand for other items held in inventory.
(True/False)
4.8/5
(39)
One of the three types of MRP action notices possible is releasing a new order.Which one of the following statements is TRUE about releasing a new order?
(Multiple Choice)
4.8/5
(35)
________ are orders that have not yet been released to the shop or the supplier.
(Short Answer)
4.8/5
(46)
Table 13.7
-Use the information from Table 13.7.If a L4L lot-sizing rule is used,how many planned order releases are there for item XYZ?

(Multiple Choice)
4.9/5
(30)
Use the following MRP record to answer the following question.
What is the planned order release quantity in week 4?

(Multiple Choice)
4.9/5
(37)
________ is a lot-sizing rule that maintains the same order quantity each time an order is issued.
(Short Answer)
4.8/5
(41)
Showing 21 - 40 of 174
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)