Exam 12: Resource Planning
Exam 1: Creating Customer Value through Operations128 Questions
Exam 2: Supply Chain Management171 Questions
Exam 3: Process Configuration137 Questions
Exam 4: Capacity145 Questions
Exam 5: Inventory Management177 Questions
Exam 6: Quality and Process Improvement240 Questions
Exam 7: Lean Systems158 Questions
Exam 8: Managing Projects153 Questions
Exam 9: Location and Layout217 Questions
Exam 10: Managing Demand and Forecasting189 Questions
Exam 11: Operations Planning and Scheduling138 Questions
Exam 12: Resource Planning174 Questions
Exam 13: Decision Making82 Questions
Exam 14: Financial Analysis41 Questions
Exam 15: Work Measurement98 Questions
Exam 16: Learning Curve Analysis44 Questions
Exam 17: Computer-Integrated Manufacturing53 Questions
Exam 18: Acceptance Sampling Plans71 Questions
Exam 19: Simulation36 Questions
Exam 20: Special Inventory Models33 Questions
Exam 21: Linear Programming57 Questions
Exam 22: Waiting Lines109 Questions
Select questions type
Safety stock is more complex for independent demand items than for dependent demand items.
(True/False)
4.8/5
(29)
A higher than normal level of equipment failures on the shop floor is likely to be detected from which of the following reports?
(Multiple Choice)
4.8/5
(41)
The lot-for-lot lot sizing technique is particularly appropriate when demand is not very smooth and setup cost is small compared to holding costs.
(True/False)
4.8/5
(42)
The ________ is a part of the material requirements plans that details how many end items will be produced within specified periods of time.
(Short Answer)
4.7/5
(40)
Table 13.2
-Use the information in Table 13.2.How many planned order releases are there for item XYZ?

(Multiple Choice)
4.8/5
(39)
One technique for projecting time-phased capacity requirements for workstations is capacity requirements planning.
(True/False)
4.9/5
(35)
To match the material requirements plan with a facilities production capacity,the capacity requirements planning technique can be used.
(True/False)
4.8/5
(39)
Material requirements planning II allows MRP to be used in services.
(True/False)
4.8/5
(33)
Table 13.1
-Use the following MRP record to answer the question.
What will be the projected on-hand inventory quantity in week 8?


(Multiple Choice)
4.8/5
(49)
Explain the major difference for resource planning in service firms compared to manufacturers.
(Essay)
4.8/5
(39)
Table 13.2
-Use the following MRP record to answer the question.
Which one of the following statements about item QRS is TRUE?


(Multiple Choice)
4.7/5
(37)
A term for systems that are large,integrated information systems which support many enterprise processes and data storage needs is called
(Multiple Choice)
4.7/5
(38)
Table 13.2
-Use the information in Table 13.2.If the lot sizing was POQ (P = 3)instead of L4L,how many planned order releases would there be?

(Multiple Choice)
4.7/5
(39)
An end item is an item that has at least one parent and at least one component.
(True/False)
4.8/5
(38)
Table 13.1
-Use the information in Table 13.1.In which week will the second planned order release occur?

(Multiple Choice)
5.0/5
(33)
A purchased item has one or more components because it comes from a supplier.
(True/False)
4.8/5
(32)
A parent is any item that may go through one or more operations to be processed into one or more components.
(True/False)
4.8/5
(30)
Which best defines the gross requirements for a component item?
(Multiple Choice)
4.8/5
(35)
Showing 101 - 120 of 174
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)