Exam 12: Resource Planning

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Safety stock is more complex for independent demand items than for dependent demand items.

(True/False)
4.8/5
(29)

A higher than normal level of equipment failures on the shop floor is likely to be detected from which of the following reports?

(Multiple Choice)
4.8/5
(41)

The lot-for-lot lot sizing technique is particularly appropriate when demand is not very smooth and setup cost is small compared to holding costs.

(True/False)
4.8/5
(42)

The ________ is a part of the material requirements plans that details how many end items will be produced within specified periods of time.

(Short Answer)
4.7/5
(40)

Table 13.2 Table 13.2    -Use the information in Table 13.2.How many planned order releases are there for item XYZ? -Use the information in Table 13.2.How many planned order releases are there for item XYZ?

(Multiple Choice)
4.8/5
(39)

One technique for projecting time-phased capacity requirements for workstations is capacity requirements planning.

(True/False)
4.9/5
(35)

To match the material requirements plan with a facilities production capacity,the capacity requirements planning technique can be used.

(True/False)
4.8/5
(39)

Material requirements planning II allows MRP to be used in services.

(True/False)
4.8/5
(33)

Table 13.1 Table 13.1    -Use the following MRP record to answer the question.   What will be the projected on-hand inventory quantity in week 8? -Use the following MRP record to answer the question. Table 13.1    -Use the following MRP record to answer the question.   What will be the projected on-hand inventory quantity in week 8? What will be the projected on-hand inventory quantity in week 8?

(Multiple Choice)
4.8/5
(49)

Describe how ERP systems are designed.

(Essay)
4.8/5
(37)

Explain the major difference for resource planning in service firms compared to manufacturers.

(Essay)
4.8/5
(39)

Table 13.2 Table 13.2    -Use the following MRP record to answer the question.   Which one of the following statements about item QRS is TRUE? -Use the following MRP record to answer the question. Table 13.2    -Use the following MRP record to answer the question.   Which one of the following statements about item QRS is TRUE? Which one of the following statements about item QRS is TRUE?

(Multiple Choice)
4.7/5
(37)

A term for systems that are large,integrated information systems which support many enterprise processes and data storage needs is called

(Multiple Choice)
4.7/5
(38)

Table 13.2 Table 13.2    -Use the information in Table 13.2.If the lot sizing was POQ (P = 3)instead of L4L,how many planned order releases would there be? -Use the information in Table 13.2.If the lot sizing was POQ (P = 3)instead of L4L,how many planned order releases would there be?

(Multiple Choice)
4.7/5
(39)

An end item is an item that has at least one parent and at least one component.

(True/False)
4.8/5
(38)

Table 13.1 Table 13.1    -Use the information in Table 13.1.In which week will the second planned order release occur? -Use the information in Table 13.1.In which week will the second planned order release occur?

(Multiple Choice)
5.0/5
(33)

Which of the following statements concerning MRP is TRUE?

(Multiple Choice)
4.8/5
(23)

A purchased item has one or more components because it comes from a supplier.

(True/False)
4.8/5
(32)

A parent is any item that may go through one or more operations to be processed into one or more components.

(True/False)
4.8/5
(30)

Which best defines the gross requirements for a component item?

(Multiple Choice)
4.8/5
(35)
Showing 101 - 120 of 174
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)