Exam 12: Resource Planning

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A(n)________ is a computer-generated memo used by inventory planners to make decisions about releasing new orders and adjusting the due dates of scheduled receipts.

(Short Answer)
4.9/5
(46)

Table 13.5 Table 13.5    -Use the following MRP record to answer the question.   What is the total planned order release quantity for item QRS? (Sum up the planned order releases for all 8 weeks) -Use the following MRP record to answer the question. Table 13.5    -Use the following MRP record to answer the question.   What is the total planned order release quantity for item QRS? (Sum up the planned order releases for all 8 weeks) What is the total planned order release quantity for item QRS? (Sum up the planned order releases for all 8 weeks)

(Multiple Choice)
4.9/5
(47)

The principles of MRP should not be applied to distribution systems.

(True/False)
4.7/5
(34)

MRP is generally practiced on items emanating from independent demand.

(True/False)
4.8/5
(40)

The master production schedule (MPS)details how many end items will be produced within specified periods of time.

(True/False)
4.9/5
(41)

Projected ________ inventory is an estimate of the amount of inventory available each week after gross requirements have been satisfied.

(Short Answer)
4.8/5
(43)

Table 13.3 Consider the following MPS, BOM, and inventory data. You will need a blank MRP record to answer the question(s). Master Production Schedule: the following table shows the MPS start quantities. Week Week 1 2 3 4 5 6 A 50 80 100 B 60 100 Bill of Material -End item A uses 1 each of component C and 1 each of subassembly D. -Subassembly D uses 2 each of component E and 2 each of component F. -End item B uses 1 each of component C and 2 each of component F. Selected Inventory Data Item Data Category Lot-sizing rule A A =250 POQ (P = Lead time (wks) 3 1 3 2) Beginning (on-hand) 50 80 90 1 inventory 80( wk 1) None 250( wk 3) 30 Scheduled receipts wk 1) -Use the information in Table 13.3.Which one of the following statements about item E is TRUE?

(Multiple Choice)
4.7/5
(37)

An item is called a dependent demand item because demand is dependent on customer preferences.

(True/False)
4.8/5
(42)

For items manufactured in-house,one component of lead time is waiting time.

(True/False)
4.7/5
(35)

Table 13.3 Consider the following MPS, BOM, and inventory data. You will need a blank MRP record to answer the question(s). Master Production Schedule: the following table shows the MPS start quantities. Week Week 1 2 3 4 5 6 A 50 80 100 B 60 100 Bill of Material -End item A uses 1 each of component C and 1 each of subassembly D. -Subassembly D uses 2 each of component E and 2 each of component F. -End item B uses 1 each of component C and 2 each of component F. Selected Inventory Data Item Data Category Lot-sizing rule A A =250 POQ (P = Lead time (wks) 3 1 3 2) Beginning (on-hand) 50 80 90 1 inventory 80( wk 1) None 250( wk 3) 30 Scheduled receipts wk 1) -Use the information in Table 13.3.Which one of the following statements about item F is TRUE?

(Multiple Choice)
4.8/5
(43)

Discuss the differences and similarities among material requirements planning,and enterprise resource planning systems.

(Essay)
4.9/5
(38)

Table 13.6 Table 13.6    -Use the information from Table 13.6.What is the planned receipts quantity in week 3? -Use the information from Table 13.6.What is the planned receipts quantity in week 3?

(Multiple Choice)
4.8/5
(42)

________ is a computerized information system developed specifically to aid in managing dependent demand inventory and scheduling replenishment orders.

(Short Answer)
4.8/5
(39)

A(n)________ is a record of all the required materials,equipment time,staff,and other resources needed to provide a service,the parent-component relationship,and the usage quantities.

(Short Answer)
4.9/5
(38)

The Bill of Resources is a list of

(Multiple Choice)
4.8/5
(36)

Table 13.4 Consider the MPS, BOM and inventory data shown below. Master Production Schedule: the following table shows the MPS start quantities. Week Week 1 2 3 4 5 6 MPS 80 80 Bill of Material -Item A uses 1 each of component D, 2 each of component C and 2 each of subassembly B. -Subassembly B uses 1 each of component D. Selected Inventory Data Item Data Category B Lot-sizing rule LAL OQ=180 (=2) Lead time (wks) 1 1 2 Beginning (on-hand) 30 160 50 inventory 190 (wk 2) 180( wk 11) 80( wk 1) Scheduled receipts -Use the information in Table 13.4.What are the total planned receipts for item D? (Sum up the planned receipts for all periods.)

(Multiple Choice)
4.7/5
(29)

Material requirements planning (MRP)is a computerized information system developed specifically to aid in managing dependent demand inventory and scheduling replenishment orders.

(True/False)
4.9/5
(38)

Which of the following statements about MRP is TRUE?

(Multiple Choice)
4.8/5
(40)

To make effective use of a dependent inventory demand model,what information is necessary for an operations manager?

(Essay)
4.8/5
(37)

The ability of one piece of software to interact with others is called ________ .

(Short Answer)
4.8/5
(42)
Showing 121 - 140 of 174