Exam 12: Resource Planning
Exam 1: Creating Customer Value through Operations128 Questions
Exam 2: Supply Chain Management171 Questions
Exam 3: Process Configuration137 Questions
Exam 4: Capacity145 Questions
Exam 5: Inventory Management177 Questions
Exam 6: Quality and Process Improvement240 Questions
Exam 7: Lean Systems158 Questions
Exam 8: Managing Projects153 Questions
Exam 9: Location and Layout217 Questions
Exam 10: Managing Demand and Forecasting189 Questions
Exam 11: Operations Planning and Scheduling138 Questions
Exam 12: Resource Planning174 Questions
Exam 13: Decision Making82 Questions
Exam 14: Financial Analysis41 Questions
Exam 15: Work Measurement98 Questions
Exam 16: Learning Curve Analysis44 Questions
Exam 17: Computer-Integrated Manufacturing53 Questions
Exam 18: Acceptance Sampling Plans71 Questions
Exam 19: Simulation36 Questions
Exam 20: Special Inventory Models33 Questions
Exam 21: Linear Programming57 Questions
Exam 22: Waiting Lines109 Questions
Select questions type
A(n)________ is a computer-generated memo used by inventory planners to make decisions about releasing new orders and adjusting the due dates of scheduled receipts.
(Short Answer)
4.9/5
(46)
Table 13.5
-Use the following MRP record to answer the question.
What is the total planned order release quantity for item QRS? (Sum up the planned order releases for all 8 weeks)


(Multiple Choice)
4.9/5
(47)
The principles of MRP should not be applied to distribution systems.
(True/False)
4.7/5
(34)
MRP is generally practiced on items emanating from independent demand.
(True/False)
4.8/5
(40)
The master production schedule (MPS)details how many end items will be produced within specified periods of time.
(True/False)
4.9/5
(41)
Projected ________ inventory is an estimate of the amount of inventory available each week after gross requirements have been satisfied.
(Short Answer)
4.8/5
(43)
Table 13.3
Consider the following MPS, BOM, and inventory data. You will need a blank MRP record to answer the question(s).
Master Production Schedule: the following table shows the MPS start quantities.
Week
Week 1 2 3 4 5 6 A 50 80 100 B 60 100
Bill of Material
-End item A uses 1 each of component C and 1 each of subassembly D.
-Subassembly D uses 2 each of component E and 2 each of component F.
-End item B uses 1 each of component C and 2 each of component F.
Selected Inventory Data
Item
Data Category Lot-sizing rule A A =250 POQ (P = Lead time (wks) 3 1 3 2) Beginning (on-hand) 50 80 90 1 inventory 80( wk 1) None 250( wk 3) 30 Scheduled receipts wk 1)
-Use the information in Table 13.3.Which one of the following statements about item E is TRUE?
(Multiple Choice)
4.7/5
(37)
An item is called a dependent demand item because demand is dependent on customer preferences.
(True/False)
4.8/5
(42)
For items manufactured in-house,one component of lead time is waiting time.
(True/False)
4.7/5
(35)
Table 13.3
Consider the following MPS, BOM, and inventory data. You will need a blank MRP record to answer the question(s).
Master Production Schedule: the following table shows the MPS start quantities.
Week
Week 1 2 3 4 5 6 A 50 80 100 B 60 100
Bill of Material
-End item A uses 1 each of component C and 1 each of subassembly D.
-Subassembly D uses 2 each of component E and 2 each of component F.
-End item B uses 1 each of component C and 2 each of component F.
Selected Inventory Data
Item
Data Category Lot-sizing rule A A =250 POQ (P = Lead time (wks) 3 1 3 2) Beginning (on-hand) 50 80 90 1 inventory 80( wk 1) None 250( wk 3) 30 Scheduled receipts wk 1)
-Use the information in Table 13.3.Which one of the following statements about item F is TRUE?
(Multiple Choice)
4.8/5
(43)
Discuss the differences and similarities among material requirements planning,and enterprise resource planning systems.
(Essay)
4.9/5
(38)
Table 13.6
-Use the information from Table 13.6.What is the planned receipts quantity in week 3?

(Multiple Choice)
4.8/5
(42)
________ is a computerized information system developed specifically to aid in managing dependent demand inventory and scheduling replenishment orders.
(Short Answer)
4.8/5
(39)
A(n)________ is a record of all the required materials,equipment time,staff,and other resources needed to provide a service,the parent-component relationship,and the usage quantities.
(Short Answer)
4.9/5
(38)
Table 13.4
Consider the MPS, BOM and inventory data shown below. Master Production Schedule: the following table shows the MPS start quantities.
Week
Week 1 2 3 4 5 6 MPS 80 80
Bill of Material
-Item A uses 1 each of component D, 2 each of component C and 2 each of subassembly B.
-Subassembly B uses 1 each of component D.
Selected Inventory Data
Item
Data Category B Lot-sizing rule LAL OQ=180 (=2) Lead time (wks) 1 1 2 Beginning (on-hand) 30 160 50 inventory 190 (wk 2) 180( wk 11) 80( wk 1) Scheduled receipts
-Use the information in Table 13.4.What are the total planned receipts for item D? (Sum up the planned receipts for all periods.)
(Multiple Choice)
4.7/5
(29)
Material requirements planning (MRP)is a computerized information system developed specifically to aid in managing dependent demand inventory and scheduling replenishment orders.
(True/False)
4.9/5
(38)
To make effective use of a dependent inventory demand model,what information is necessary for an operations manager?
(Essay)
4.8/5
(37)
The ability of one piece of software to interact with others is called ________ .
(Short Answer)
4.8/5
(42)