Exam 7: Process Strategies
Exam 1: Operations and Productivity138 Questions
Exam 2: Operations Strategy in a Global Environment134 Questions
Exam 3: Project Management131 Questions
Exam 4: Forecasting148 Questions
Exam 5: Design of Goods and Services126 Questions
Exam 6: Managing Quality226 Questions
Exam 7: Process Strategies259 Questions
Exam 8: Location Strategies233 Questions
Exam 9: Human Resources, Job Design, and Work Measurement321 Questions
Exam 10: Supply Chain Management158 Questions
Exam 11: Inventory Management230 Questions
Exam 12: Aggregate Planning and Sop122 Questions
Exam 13: Material Requirements Planning Mrp and Erp133 Questions
Exam 14: Short-Term Scheduling124 Questions
Exam 15: Lean Operations122 Questions
Exam 16: Maintenance and Reliability119 Questions
Exam 17: Decision-Making Tools101 Questions
Exam 18: Linear Programming102 Questions
Exam 19: Transportation Models92 Questions
Exam 20: Waiting-Line Models126 Questions
Exam 21: Learning Curves114 Questions
Exam 22: Simulation78 Questions
Exam 23: Applying Analytics to Big Data in Operations Management61 Questions
Select questions type
An example of the postponement strategy for improving service productivity is having the customer wait until you have sufficient time to serve the customer.
(True/False)
4.8/5
(37)
Individual measurements, not averages of small samples, are generally used in statistical process control.
(True/False)
4.9/5
(30)
The specifications for a manifold gasket that installs between two engine parts calls for a thickness of 2.500 mm ± .020 mm. The standard deviation of the process is estimated to be 0.004 mm. The process is currently operating at a mean thickness of 2.50 mm. (a) What are the upper and lower specification limits for this product? (b) What is the Cp for this process? (c) The purchaser of these parts requires a capability index of 1.50. Is this process capable? Is this process good enough for the supplier? (d) If the process mean were to drift from its setting of 2.500 mm to a new mean of 2.497, would the process still be good enough for the supplier's needs?
(Essay)
4.7/5
(43)
If the Cp value suggests a capable process, the Cpk value for the same process will also suggest a capable process.
(True/False)
4.8/5
(36)
Time-function mapping is a flowchart with time added to the horizontal axis.
(True/False)
4.8/5
(33)
Which of the following is FALSE regarding repetitive processes?
(Multiple Choice)
4.8/5
(50)
A(n) ________ uses an automated work cell controlled by electronic signals from a common centralized computer facility.
(Short Answer)
4.9/5
(42)
Kirstin is thinking about opening a Chinese restaurant and needs to buy a rice cooker. Machine A has fixed costs of $100 and variable costs of $1/pound. Machine B has fixed costs of $500 and variable costs of $0.10/pound. If Kirstin plans to sell 1000 pounds of rice, which machine should she choose? What is the crossover point?
(Essay)
4.9/5
(35)
Provide an example of the postponement strategy for improving service productivity.
(Essay)
4.8/5
(32)
Jus de Fruit Co. has set up for automated production of its new bottled Triple Berry Colada. Five samples were taken during the first week of production. The OM team wants to check if the dispersion of the process is in control. What will be the upper and lower control limits, respectively? 

(Multiple Choice)
4.9/5
(32)
The upper and lower limits for diving ring diameters made by John's Swimming Co. are 40 and 39 cm., respectively. John took 11 samples with the following average diameters (39, 39.1, 39.2, 39.3, 39.4, 39.5 39.6, 39.7, 39.8, 39.9, 40). Is the process in control?
(Multiple Choice)
4.8/5
(46)
The specifications for a manifold gasket that installs between two engine parts calls for a thickness of 2.500 mm ± .030 mm. The standard deviation of the process is estimated to be 0.004 mm. The process is currently operating at a mean thickness of 2.50 mm. (a) What are the upper and lower specification limits for this product? (b) What is the Cp for this process? (c) About what percent of all units of this gasket will meet specifications? Does this meet the technical definition of Six Sigma?
(Essay)
4.7/5
(30)
A p-chart is appropriate to plot the number of typographic errors per page of text.
(True/False)
4.8/5
(37)
Briefly explain what the Central Limit Theorem has to do with control charts.
(Essay)
4.8/5
(40)
Which of the following is TRUE regarding the process capability index Cpk?
(Multiple Choice)
4.9/5
(28)
Which of the following businesses uses a product-focused approach?
(Multiple Choice)
4.8/5
(33)
Showing 241 - 259 of 259
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)