Exam 7: Process Strategies
Exam 1: Operations and Productivity138 Questions
Exam 2: Operations Strategy in a Global Environment134 Questions
Exam 3: Project Management131 Questions
Exam 4: Forecasting148 Questions
Exam 5: Design of Goods and Services126 Questions
Exam 6: Managing Quality226 Questions
Exam 7: Process Strategies259 Questions
Exam 8: Location Strategies233 Questions
Exam 9: Human Resources, Job Design, and Work Measurement321 Questions
Exam 10: Supply Chain Management158 Questions
Exam 11: Inventory Management230 Questions
Exam 12: Aggregate Planning and Sop122 Questions
Exam 13: Material Requirements Planning Mrp and Erp133 Questions
Exam 14: Short-Term Scheduling124 Questions
Exam 15: Lean Operations122 Questions
Exam 16: Maintenance and Reliability119 Questions
Exam 17: Decision-Making Tools101 Questions
Exam 18: Linear Programming102 Questions
Exam 19: Transportation Models92 Questions
Exam 20: Waiting-Line Models126 Questions
Exam 21: Learning Curves114 Questions
Exam 22: Simulation78 Questions
Exam 23: Applying Analytics to Big Data in Operations Management61 Questions
Select questions type
________ is a process strategy based on a product-oriented production process that uses modules.
(Short Answer)
4.7/5
(35)
Identify the techniques for improving service productivity. For any two techniques, describe in a short paragraph, and include an example.
(Essay)
4.7/5
(30)
If μ = 9 ounces, σ = 0.5 ounces, and n = 9, calculate the 3-sigma control limits for the x-bar chart.
(Short Answer)
4.8/5
(45)
Which of the following provides automatic placement and withdrawal of parts and products into and from designated places in a warehouse?
(Multiple Choice)
4.8/5
(39)
An acceptance sampling plan must define "good lots" and "bad lots" and specify the risk level associated with each one.
(True/False)
4.8/5
(35)
Control charts for variables are based on data that come from:
(Multiple Choice)
4.9/5
(30)
If the Cpk value suggests a capable process, the Cp value for the same process will also suggest a capable process.
(True/False)
5.0/5
(42)
In most acceptance sampling plans, when a lot is rejected, the entire lot is inspected and all defective items are replaced. When using this technique the AOQ:
(Multiple Choice)
4.9/5
(41)
What is the statistical process chart used to control the number of defects per unit of output?
(Multiple Choice)
4.9/5
(30)
An acceptance sampling plan is to be designed to meet the organization's targets for product quality and risk levels. Which of the following is true?
(Multiple Choice)
4.8/5
(40)
Define consumer's risk. Is it a Type I or Type II error? What is the symbol for its value?
(Essay)
4.8/5
(31)
________ is a process analysis technique that focuses on the customer and the provider's interaction with the customer.
(Short Answer)
4.8/5
(34)
Process control is the use of information technology to monitor and control a physical process.
(True/False)
4.9/5
(33)
Red Top Cab Company receives multiple complaints per day about driver behavior. Over 8 days the owner recorded the number of calls to be 3, 0, 8, 9, 6, 7, 9, and 8. What is the upper control limit for the 3-sigma c-chart?
(Multiple Choice)
4.8/5
(40)
Average outgoing quality (AOQ) is determined by the true percentage defective of the lot, the acceptable quality level, the number of items in the lot, and the number of items in the sample.
(True/False)
4.7/5
(32)
Showing 141 - 160 of 259
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)