Exam 5: Estimating Project Times and Costs
Exam 1: Modern Project Management88 Questions
Exam 2: Organization Strategy and Project Selection101 Questions
Exam 3: Organization: Structure and Culture102 Questions
Exam 4: Defining the Project112 Questions
Exam 5: Estimating Project Times and Costs95 Questions
Exam 6: Developing a Project Schedule128 Questions
Exam 7: Managing Risk105 Questions
Exam 8: Scheduling Resources and Costs114 Questions
Exam 9: Reducing Project Duration106 Questions
Exam 10: Being an Effective Project Manager98 Questions
Exam 11: Managing Project Teams103 Questions
Exam 12: Outsourcing: Managing Interorganizational Relations102 Questions
Exam 13: Progress and Performance Measurement and Evaluation98 Questions
Exam 14: Project Closure97 Questions
Exam 15: Agile Project Management94 Questions
Exam 16: International Projects103 Questions
Select questions type
Which of the following is NOT one of the factors that need to be considered to improve quality of estimates for project times and costs?
(Multiple Choice)
4.9/5
(33)
Consider a five-mile-long railroad tunnel. Tunnel experts and advocates estimate the total cost to be $200 million. What is the reference class for this project? But reference class projects in this area have been over-budget by 30%. So, what should the actual revised budget number be for this proposed five-mile tunnel project?
(Multiple Choice)
5.0/5
(40)
Project managers typically use ________, also called analogous estimating or the ______ method when there is a past history of similar projects and rough-cut estimates are needed for strategic purposes two-to-five years out because, as estimating methods go, it is faster and less expensive.
(Multiple Choice)
4.8/5
(48)
In practice, estimating processes are frequently classified as
(Multiple Choice)
4.9/5
(32)
A way to improve estimates on future projects is to collect and archive data on past project estimates and actuals. Creating ___________ for estimating is a way to achieve this goal.
(Multiple Choice)
4.7/5
(35)
Project costs such as labor and materials are typically classified as ___________ costs.
(Multiple Choice)
4.8/5
(37)
The salary of the project manager would be an example of what type of cost found in a project?
(Multiple Choice)
4.8/5
(40)
Estimates are supposed to be based on normal conditions. While this is a good starting point, it rarely holds true in real life.
(True/False)
4.9/5
(41)
Thinking holistically, suppose a new, unique project is being estimated in which there is unstable scope. There is high uncertainty in the duration and cost of each work package. Uncertainty as to which work packages to include / exclude is abundant. A project of this type has never been done before and the customer is uncertain of what they want. There are no previous similar projects or a history data base of work package durations and costs to work from. Top-down estimates of total project cost and duration do not exist. You have a dedicated team of ten seasoned project professionals working for you. You worked hard to develop a well-structured WBS for the project. Each work package (there are ten) has been assigned (by you as project manager) to exactly one project professional to develop and complete. You wish to do a bottom-up definitive determination of overall project duration and cost. The customer wants cost and duration details. Under such circumstances, how would you proceed? What assumptions would you have to make? How would you come up with estimates as to duration and cost for each work package?
(Essay)
4.9/5
(42)
Estimates that are typically based on estimates of elements found in the work breakdown structure are called bottom-up estimates.
(True/False)
4.9/5
(37)
As long as everyone in a project adds a little padding to reduce risk, the project duration and cost estimates will be more accurate.
(True/False)
5.0/5
(41)
The salary of the project manager and temporary rental space for the project team would be classified as __________ costs.
(Multiple Choice)
4.8/5
(39)
After averaging out the underestimates and overestimates, a long-duration project is more likely to be on target than a short-term, small project.
(True/False)
4.9/5
(38)
The bottom-up method of estimating where work package time and costs for past projects are used as a starting point for a new project and adjustments are made based on differences in the new project is known as the ___________.
(Multiple Choice)
4.8/5
(37)
Costs that are associated with time devoted to the coordination in meetings and briefings as well as time necessary to resolve disconnects between tasks are known as ____________ costs.
(Multiple Choice)
4.9/5
(36)
A project to return Americans to the moon has been estimated to cost $100 billion and take five years to complete, but past similar projects have cost 30% more and taken 20% longer. What should the revised estimates for cost and time be? Because of the long duration, the effects of the time value of money should be taken into consideration-what does this do to the estimated budget and duration. Assume a 3% annual inflation rate.
(Essay)
4.9/5
(34)
The top-down method of estimating project time and costs that is useful for projects requiring the same task, group of tasks, or product repeated several times, especially if it is labor intensive, is the ______________.
(Multiple Choice)
4.9/5
(35)
If a project is internal to the company and relatively small, the bottom-up approach to estimating time and costs for the project is the best choice.
(True/False)
4.9/5
(35)
List and briefly explain two reasons why estimates may need to be refined.
(Short Answer)
4.8/5
(28)
Typical kinds of costs found in a project include all of the following EXCEPT
(Multiple Choice)
4.9/5
(33)