Process layout is associated with all of the following EXCEPT:

Free
(Multiple Choice)
4.8/5
(35)
Correct Answer:
Verified

D

Which of the following types of facility layouts would W.H.Painting and College Pro Painters use?

Free
(Multiple Choice)
4.8/5
(43)
Correct Answer:
Verified

D

Operations is the function that monitors and controls the financial part of producing a product or service.

Free
(True/False)
4.8/5
(26)
Correct Answer:
Verified

False

Fixed-position layout is associated with all of the following EXCEPT:

(Multiple Choice)
4.9/5
(34)

Which of the following is NOT one of the four major TQM principles?

(Multiple Choice)
4.7/5
(33)

The same amount of outputs produced with less inputs is a(n):

(Multiple Choice)
4.8/5
(34)

Computer-assisted manufacturing includes computer-aided design (CAD),computer-integrated design (CID),and computer-aided manufacturing (CAM).

(True/False)
4.8/5
(30)

The balanced scorecard measures all of the following EXCEPT:

(Multiple Choice)
4.9/5
(49)

Six Sigma's goal is only 1.4 defects or mistakes per million operations.

(True/False)
4.7/5
(37)

Armand V.Feigenbaum said that maintaining quality is expensive and focusing on improving quality will not lower costs.

(True/False)
4.8/5
(30)

Explain the relationship among inventory control,just-in-time (JIT)inventory,and materials requirement planning (MRP).

(Essay)
4.7/5
(33)

Which of the following scheduling tools would an automobile company most likely use when designing an automobile engine?

(Multiple Choice)
4.8/5
(44)

Which of the following is NOT one of the methods used to schedule operations?

(Multiple Choice)
4.8/5
(36)

The __________ certifies firms that meet set quality standards.

(Multiple Choice)
4.9/5
(41)

Scheduling is the process of listing activities that must be performed to accomplish an objective.

(True/False)
4.9/5
(29)

Inventory control is the process of managing raw materials,work-in-process,finished goods,and in-transit goods.

(True/False)
4.9/5
(37)

Routing is the continuing evaluation and reordering of the sequence in which products will be produced.

(True/False)
4.8/5
(31)

Which of the following quality gurus led the movement in TQM?

(Multiple Choice)
4.8/5
(31)

A capital-intensive,repetitive continuous process operation uses a __________ layout.

(Multiple Choice)
4.9/5
(43)

Haircuts,dry cleaning,and legal advice are __________ products.

(Multiple Choice)
4.7/5
(33)