The criteria for project success include attaining objectives relating to cost, schedule, and revenue.

(True/False)
4.7/5
(31)

The intersection of work packages and the organization unit creates a project control point called a cost account.

(True/False)
4.9/5
(34)

All of the following are usually included in a work package except

(Multiple Choice)
4.7/5
(34)

Taking advantage of opportunities to reduce costs or accelerate the schedule are examples of project criteria being classified as ________.

(Short Answer)
5.0/5
(40)

The Work Breakdown Structure is an outline of the project with different levels of __________.

(Short Answer)
5.0/5
(37)

The result of subdividing the work of a project into smaller and smaller work elements is called ________.

(Short Answer)
4.7/5
(37)

The lowest element in the hierarchical breakdown of the WBS is

(Multiple Choice)
4.7/5
(34)

"To construct a high-quality, custom home within five months at costs not to exceed $150,000" is best classified as

(Multiple Choice)
4.9/5
(29)

For large companies, the organization breakdown structure is used rather than the work breakdown structure.

(True/False)
4.8/5
(28)

What is an OBS and how would you use it to plan a project?

(Essay)
4.8/5
(35)

Which of the following is a good example of a Process Breakdown Structure?

(Multiple Choice)
5.0/5
(40)

In general, work packages should not exceed 10 work days.

(True/False)
4.9/5
(32)

Which of the following is not one of the basic classifications of project priorities?

(Multiple Choice)
4.9/5
(27)

One of the items included on a project scope checklist is the reviews with the customer.

(True/False)
4.8/5
(32)

The second step in the defining of a project would be to

(Multiple Choice)
4.9/5
(32)

The integration of project work packages within the organization's management structure is known as

(Multiple Choice)
4.8/5
(26)

In a ________ the project is organized around phases or groups of activities rather than the more conventional deliverables.

(Short Answer)
4.9/5
(34)

All of the following are true about work packages except

(Multiple Choice)
4.8/5
(31)

In a work breakdown structure deliverables are ignored and replaced with activities or tasks that have been grouped in phases.

(True/False)
4.9/5
(37)

The intersection of the WBS and the OBS represents a control point, called a cost account.

(True/False)
4.8/5
(43)