Exam 3: Statistical Quality Control
Exam 1: Operations Management63 Questions
Exam 2: Quality Management71 Questions
Exam 3: Statistical Quality Control111 Questions
Exam 4: Product Design75 Questions
Exam 5: Service Design79 Questions
Exam 6: Processes and Technology61 Questions
Exam 17: Scheduling80 Questions
Exam 7: Capacity and Facilities83 Questions
Exam 8: Human Resources79 Questions
Exam 9: Project Management85 Questions
Exam 10: Supply Chain Management: Strategy and Design56 Questions
Exam 11: Global Supply Chain Procurement and Distribution69 Questions
Exam 12: Forecasting85 Questions
Exam 13: Inventory Management78 Questions
Exam 13: Operational Decision-Making Tools: Simulation22 Questions
Exam 14: Operational Decision-Making Tools: Linear Programming29 Questions
Exam 14: The Sales and Operations Planning Process76 Questions
Exam 15: Resource Planning82 Questions
Exam 16: Lean Systems79 Questions
Exam 18: Operational Decision-Making Tools: Decision Analysis38 Questions
Exam 19: Operational Decision-Making Tools: Acceptance Sampling28 Questions
Exam 20: Decision-Making Tools: Facility Location Models23 Questions
Exam 21: Operational Decision-Making Tools: Work Measurement31 Questions
Select questions type
Which of the following control charts is used to monitor the number of defective items within a sample?
(Multiple Choice)
4.7/5
(23)
The process capability index is used only for p and c charts while the process capability ratio is used only for xbar and R charts.
(True/False)
4.8/5
(32)
Statistical process control is only effective for service processes.
(True/False)
4.7/5
(32)
All processes contain a certain amount of variation in their output.
(True/False)
4.8/5
(48)
The process capability index indicates how much a process mean differs from the target specification value.
(True/False)
4.8/5
(41)
The formula used to determine the upper and lower control limits are based on specification limits.
(True/False)
4.8/5
(39)
The smaller the historical proportion defective reported for a process,the larger the sample size required to detect special cause variation with a p-chart.
(True/False)
4.7/5
(39)
Only certified statisticians should use Excel to construct a control chart for a process.
(True/False)
4.9/5
(32)
The R-chart is used for monitoring and controlling variation within samples.
(True/False)
4.9/5
(34)
If the quality of a process's output is determined by the difference between the largest and smallest values in a sample,use an)_______control chart.
(Multiple Choice)
4.9/5
(38)
If the quality of a process's output is determined by classifying the output as being defective or not defective,use an)________control chart.
(Multiple Choice)
4.8/5
(39)
Excel can be used to increase the efficiency and accuracy of determining the process capability ratio and the process capability index.
(True/False)
4.7/5
(23)
Control limits are based on the special cause variation inherent in a process.
(True/False)
4.8/5
(39)
A quantitative variable classifies while a qualitative variable attribute)measures.
(True/False)
4.9/5
(38)
Statistical process control is a subset of statistical quality control.
(True/False)
4.8/5
(35)
Which of the following is NOT a characteristic of a control chart?
(Multiple Choice)
4.7/5
(30)
Which of the following is NOT a primary purpose of statistical process control?
(Multiple Choice)
4.8/5
(36)
A company produces a product which is designed to weigh 10 oz. ,with a tolerance of
oz.The process produces products with an average weight of 9.95 oz.and a standard deviation of 0.10 oz.The process capability index for this process with z = 3 is

(Multiple Choice)
4.9/5
(43)
For a given process,the process capability ratio is NOT related to its control limits.
(True/False)
4.8/5
(37)