Exam 3: Statistical Quality Control
Exam 1: Operations Management63 Questions
Exam 2: Quality Management71 Questions
Exam 3: Statistical Quality Control111 Questions
Exam 4: Product Design75 Questions
Exam 5: Service Design79 Questions
Exam 6: Processes and Technology61 Questions
Exam 17: Scheduling80 Questions
Exam 7: Capacity and Facilities83 Questions
Exam 8: Human Resources79 Questions
Exam 9: Project Management85 Questions
Exam 10: Supply Chain Management: Strategy and Design56 Questions
Exam 11: Global Supply Chain Procurement and Distribution69 Questions
Exam 12: Forecasting85 Questions
Exam 13: Inventory Management78 Questions
Exam 13: Operational Decision-Making Tools: Simulation22 Questions
Exam 14: Operational Decision-Making Tools: Linear Programming29 Questions
Exam 14: The Sales and Operations Planning Process76 Questions
Exam 15: Resource Planning82 Questions
Exam 16: Lean Systems79 Questions
Exam 18: Operational Decision-Making Tools: Decision Analysis38 Questions
Exam 19: Operational Decision-Making Tools: Acceptance Sampling28 Questions
Exam 20: Decision-Making Tools: Facility Location Models23 Questions
Exam 21: Operational Decision-Making Tools: Work Measurement31 Questions
Select questions type
If the points plotted on a control chart display a pattern,it is called a run.
(True/False)
4.7/5
(30)
Attribute qualitative)control charts are used to monitor descriptive characteristics of the output of a process.
(True/False)
4.9/5
(30)
The process capability ratio measures the specification limits over the control limits.
(True/False)
4.9/5
(39)
A company randomly selects 100 light bulbs every day for 40 days from its production process.If 600 defective light bulbs are found in the sampled bulbs then the estimate for the process average defective would be
(Multiple Choice)
4.9/5
(33)
With a c-chart,the sample size is small and often contains only one item.
(True/False)
4.8/5
(31)
In some cases,the xbar-chart is used without the R-chart because the within sample variation is not of concern.
(True/False)
4.8/5
(46)
When special cause variation is detected it is normally eliminated by increasing the number of standard deviations Z value)used to calculate the control limits.
(True/False)
4.9/5
(35)
Which of the following control charts are based on sample sizes as small as one?
(Multiple Choice)
4.7/5
(33)
Statistical process control is based on a philosophy of inspection as opposed to prevention.
(True/False)
4.8/5
(37)
In some cases,the xbar-chart is used without an R-chart because there is no variation between the samples.
(True/False)
4.8/5
(31)
Some companies that strive to provide extremely high quality use Z=6 six sigma)vs.Z=3 three sigma)when constructing control limits.
(True/False)
4.9/5
(35)
Unique or special cause variation reflects the random variation associated with the output of a process.
(True/False)
4.9/5
(26)
Information from an R-chart can be used to construct the control limits for an xbar-chart.
(True/False)
4.9/5
(38)
The goal of statistical process control is to ensure that the control limits and specifications limits for a process always remain the same.
(True/False)
4.8/5
(31)
Which of the following control charts is used to control the variation between samples?
(Multiple Choice)
4.8/5
(29)
One advantage of using a pattern test is that special cause variations may be identified before any points are plotted outside the control limits.
(True/False)
4.9/5
(39)
Control chart sample sizes are becoming smaller because it is easier to detect a pattern with Excel or other data analysis software.
(True/False)
4.7/5
(37)
Showing 21 - 40 of 111
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)