Exam 25: Waiting-Line Models
Exam 1: Operations and Productivity129 Questions
Exam 2: Operations Strategy in a Global Environment120 Questions
Exam 3: Project Management124 Questions
Exam 4: Forecasting141 Questions
Exam 5: Design of Goods and Services121 Questions
Exam 6: Managing Quality125 Questions
Exam 7: Process Strategy113 Questions
Exam 8: Location Strategies121 Questions
Exam 9: Layout Strategies146 Questions
Exam 10: Human Resources,job Design,and Work Measurement159 Questions
Exam 11: Supply Chain Management145 Questions
Exam 12: Inventory Management165 Questions
Exam 13: Aggregate Planning and Sop116 Questions
Exam 14: Material Requirements Planning Mrpand ERP113 Questions
Exam 15: Short-Term Scheduling116 Questions
Exam 16: Lean Operations116 Questions
Exam 17: Maintenance and Reliability114 Questions
Exam 18: Sustainability in the Supply Chain84 Questions
Exam 19: Statistical Process Control144 Questions
Exam 20: Capacity and Constraint Management101 Questions
Exam 21: Supply Chain Management Analytics67 Questions
Exam 22: Decision-Making Tools100 Questions
Exam 23: Linear Programming98 Questions
Exam 24: Transportation Models89 Questions
Exam 25: Waiting-Line Models119 Questions
Exam 26: Learning Curves110 Questions
Exam 27: Simulation75 Questions
Select questions type
A waiting line,or queuing,system has three parts,which are:
(Multiple Choice)
4.7/5
(25)
A waiting line model meeting the assumptions of M/M/1 has an arrival rate of 2 per hour and a service rate of 6 per hour.What is the utilization factor for the system?
(Multiple Choice)
4.7/5
(31)
A dental clinic at which only one dentist works is open only two days a week.During those two days,patients arrive at the rate of three per hour.The doctor serves patients at the rate of one every 15 minutes.
a.What is the probability that the clinic is empty (except for the dentist and staff)?
b.What percentage of the time is the dentist busy?
c.What is the average number of patients in the waiting room?
d.What is the average time a patient spends in the office (wait plus service)?
e.What is the average time a patient waits for service?
(Essay)
4.8/5
(41)
A crew of mechanics at the Highway Department Garage repair vehicles that break down at an average of λ = 8 vehicles per day (approximately Poisson in nature).The mechanic crew can service an average of μ = 11 vehicles per day with a repair time distribution that approximates an exponential distribution.The crew cost is approximately $300 per day.The cost associated with lost productivity from the breakdown is estimated at $150 per vehicle per day (or any fraction thereof).Which is cheaper,the existing system with one service crew,or a revised system with two service crews?
(Essay)
4.8/5
(33)
A finite population waiting line model with N = 5 has an average arrival rate of 1/2 customer per hour and a mean service rate of 5 customers per hour.What is the probability the system is empty?
(Multiple Choice)
4.8/5
(36)
The common measures of a queuing system's performance include:
(Multiple Choice)
5.0/5
(37)
A waiting line or ________ is where items or people are in a line awaiting service;________ is a body of knowledge about waiting lines.
(Essay)
4.8/5
(32)
The potential restaurant customer who says to her husband,"The line looks too long;let's eat somewhere else," is an illustration of which element of arrival behavior?
(Multiple Choice)
4.8/5
(31)
A waiting-line system that meets the assumptions of M/M/1 has λ = 1,μ = 4.For this system,what is the probability of more than two units in the system?
(Multiple Choice)
4.8/5
(32)
A waiting-line system that meets the assumptions of M/M/S has λ = 5,μ = 4,and M = 2.For these values,Po is approximately 0.23077,and Ls is approximately 2.05128.What is the average number of units waiting in the queue?
(Multiple Choice)
4.8/5
(43)
A queuing model that follows the M/M/1 assumptions has λ = 2 and μ = 3.What is the average time in the system?
(Multiple Choice)
5.0/5
(32)
What are Ls and Lq,as used in waiting line terminology? Which is larger,Ls or Lq? Explain.
(Essay)
4.8/5
(45)
In the basic queuing model (M/M/1),what probability distribution describes service times?
(Multiple Choice)
4.8/5
(33)
A finite population waiting line model (D)differs from the single service model (A)in that:
(Multiple Choice)
4.9/5
(28)
Which part of a waiting line has characteristics that involve a statistical distribution?
(Multiple Choice)
4.8/5
(32)
Four of the most widely used waiting line models-M/M/1 or A,M/M/S or B,M/D/1 or C,and Finite population or D-all share three characteristics: Poisson arrivals,FIFO discipline,and exponential service times.
(True/False)
4.7/5
(34)
The ________ probability distribution is a continuous probability distribution often used to describe the service time in a queuing system.
(Essay)
4.8/5
(33)
A bank office with five tellers,each with a separate line of customers,exhibits the characteristics of a multiphase queuing system.
(True/False)
4.9/5
(36)
The source population is considered to be either ________ in its size.
(Multiple Choice)
4.9/5
(36)
Service times in an automobile repair shop tend to follow which probability distribution?
(Multiple Choice)
4.8/5
(38)
Showing 21 - 40 of 119
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)