Exam 19: Statistical Process Control
Exam 1: Operations and Productivity129 Questions
Exam 2: Operations Strategy in a Global Environment120 Questions
Exam 3: Project Management124 Questions
Exam 4: Forecasting141 Questions
Exam 5: Design of Goods and Services121 Questions
Exam 6: Managing Quality125 Questions
Exam 7: Process Strategy113 Questions
Exam 8: Location Strategies121 Questions
Exam 9: Layout Strategies146 Questions
Exam 10: Human Resources,job Design,and Work Measurement159 Questions
Exam 11: Supply Chain Management145 Questions
Exam 12: Inventory Management165 Questions
Exam 13: Aggregate Planning and Sop116 Questions
Exam 14: Material Requirements Planning Mrpand ERP113 Questions
Exam 15: Short-Term Scheduling116 Questions
Exam 16: Lean Operations116 Questions
Exam 17: Maintenance and Reliability114 Questions
Exam 18: Sustainability in the Supply Chain84 Questions
Exam 19: Statistical Process Control144 Questions
Exam 20: Capacity and Constraint Management101 Questions
Exam 21: Supply Chain Management Analytics67 Questions
Exam 22: Decision-Making Tools100 Questions
Exam 23: Linear Programming98 Questions
Exam 24: Transportation Models89 Questions
Exam 25: Waiting-Line Models119 Questions
Exam 26: Learning Curves110 Questions
Exam 27: Simulation75 Questions
Select questions type
The acceptable quality level (AQL)is the average level of quality we are willing to accept.
Free
(True/False)
4.9/5
(32)
Correct Answer:
False
An acceptance sampling plan must define "good lots" and "bad lots" and specify the risk level associated with each one.
Free
(True/False)
4.8/5
(39)
Correct Answer:
True
The specification for a plastic liner for concrete highway projects calls for a thickness of 6.0 mm ± 0.1 mm.The standard deviation of the process is estimated to be 0.02 mm.What are the upper and lower specification limits for this product? The process is known to operate at a mean thickness of 6.03 mm.What is the Cp and Cpk for this process? About what percent of all units of this liner will meet specifications?
(Essay)
4.8/5
(24)
A retail store manager is trying to improve and control the rate at which cashiers sign customers up for store credit cards.The manager takes several samples of size 50.He finds that each sample of 50 contained 5 credit card signups on average.Find p-bar and 99.73% control limits.
(Essay)
4.8/5
(36)
A hospital-billing auditor has been inspecting patient bills.While almost all bills contain some errors,the auditor is looking now for large errors (errors in excess of $250).Each day last week,the auditor examined 100 bills and found an average defect rate of 16%.Calculate the upper and lower limits for the billing process for 99.73% confidence.
(Essay)
4.8/5
(29)
Up to three standard deviations above or below the centerline is the amount of variation that statistical process control allows for:
(Multiple Choice)
4.9/5
(41)
The defect rate for a product has historically been about 1.6%.What are the upper and lower control chart limits for a p-chart,if you wish to use a sample size of 100 and 3-sigma limits?
(Essay)
4.8/5
(37)
A bank's manager has videotaped 20 different teller transactions to observe the number of mistakes being made.Ten transactions had no mistakes,five had one mistake and five had two mistakes.Compute proper control limits at the 90% confidence level.
(Essay)
4.9/5
(37)
The number of defects after a hotel room cleaning (sheets not straight,smears on mirror,missed debris on carpet,etc. )should be measured using what type of control chart?
(Multiple Choice)
4.8/5
(41)
The Central Limit Theorem states that when the sample size increases,the distribution of the sample means will approach the normal distribution.
(True/False)
4.8/5
(38)
The ________ is the lowest level of quality that we are willing to accept.
(Essay)
5.0/5
(43)
The number of late insurance claim payouts per 100 should be measured with what type of control chart?
(Multiple Choice)
4.8/5
(28)
A woodworker is concerned about the quality of the finished appearance of her work.In sampling units of a split-willow hand-woven basket,she has found the following number of finish defects in ten units sampled: 4,0,3,1,2,0,1,2,0,2.
a.Calculate the average number of defects per basket.
b.If 3-sigma control limits are used,calculate the lower control limit and upper control limit.
(Essay)
4.8/5
(41)
If a process has only natural variations,________ percent of the time the sample averages will fall inside the ±3-sigma control limits.
(Essay)
4.7/5
(37)
Showing 1 - 20 of 144
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)