Exam 6: Managing Quality
Exam 1: Operations and Productivity129 Questions
Exam 2: Operations Strategy in a Global Environment120 Questions
Exam 3: Project Management124 Questions
Exam 4: Forecasting141 Questions
Exam 5: Design of Goods and Services121 Questions
Exam 6: Managing Quality125 Questions
Exam 7: Process Strategy113 Questions
Exam 8: Location Strategies121 Questions
Exam 9: Layout Strategies146 Questions
Exam 10: Human Resources,job Design,and Work Measurement159 Questions
Exam 11: Supply Chain Management145 Questions
Exam 12: Inventory Management165 Questions
Exam 13: Aggregate Planning and Sop116 Questions
Exam 14: Material Requirements Planning Mrpand ERP113 Questions
Exam 15: Short-Term Scheduling116 Questions
Exam 16: Lean Operations116 Questions
Exam 17: Maintenance and Reliability114 Questions
Exam 18: Sustainability in the Supply Chain84 Questions
Exam 19: Statistical Process Control144 Questions
Exam 20: Capacity and Constraint Management101 Questions
Exam 21: Supply Chain Management Analytics67 Questions
Exam 22: Decision-Making Tools100 Questions
Exam 23: Linear Programming98 Questions
Exam 24: Transportation Models89 Questions
Exam 25: Waiting-Line Models119 Questions
Exam 26: Learning Curves110 Questions
Exam 27: Simulation75 Questions
Select questions type
Construct a cause-and-effect diagram for why students arrive to class late.Include at least three reasons for each of the Ms. 

Free
(Essay)
4.8/5
(32)
Correct Answer:
Student responses should look like the above,with the 4 Ms of Manpower,Machinery,Method,and Material listed.Possible responses include: Manpower- not conditioned to waking up early,I can't wake up at the same time every day,I stay up late the night before sometimes.Machinery- Car failure,Alarm clock reset from power outage,alarm clock turned off by roommate.Method- forgot to set alarm clock,incorrect alarm clock setting (AM vs PM),I could not find the classroom.Material- (these responses can be overlapped with machine answers to some degree)I wore flip flops so I could not walk fast,I could not find a sweater and did not want to go out in the cold,I lacked the proper materials for walking in the snow/ice.
Which of the determinants of service quality involves performing the service right the first time?
Free
(Multiple Choice)
4.7/5
(29)
Correct Answer:
D
The "four Ms" of cause-and-effect diagrams are:
Free
(Multiple Choice)
4.9/5
(38)
Correct Answer:
A
A professor teaches two sections of a class,one on MWF for 50 minutes per day and another on T/TH for 75 minutes per day.Use the following information to construct a scatter diagram with test # on the x-axis and score on the y-axis.Should the professor argue for a change in the university's scheduling?
MWF Section Test Results Test # T/Th Test Results
75 1 82
70 2 77
65 3 73
65 4 70
70 5 76
(Essay)
5.0/5
(32)
A quality circle holds a brainstorming session and attempts to identify the factors responsible for flaws in a product.Which tool do you suggest they use to organize their findings?
(Multiple Choice)
4.9/5
(30)
The process improvement technique that sorts the vital few from the trivial many is:
(Multiple Choice)
4.8/5
(31)
Among the tools of TQM,the tool ordinarily used to aid in understanding the sequence of events through which a product travels is a:
(Multiple Choice)
4.9/5
(29)
One of Britain's largest children's hospitals working with a Ferrari racing team is an example of:
(Multiple Choice)
4.7/5
(26)
"Quality Is Free," meaning that the costs of poor quality have been understated,is the work of:
(Multiple Choice)
4.8/5
(37)
A group of employees that meet on a regular basis with a facilitator to solve work-related problems in their work area is a(n)________.
(Essay)
4.8/5
(37)
A manager tells her production employees,"It's no longer good enough that your work falls anywhere within the specification limits.I need your work to be as close to the target value as possible." Her thinking is reflective of:
(Multiple Choice)
4.8/5
(38)
The focus of ISO 9000 is to enhance success through what eight quality management principles?
(Essay)
5.0/5
(43)
Regarding the quality of design,production,and distribution of products,an ethical requirement for management is to:
(Multiple Choice)
4.7/5
(33)
The work by ________ regarding how people learn from each other's successes led to the field of cross-functional teamwork.
(Essay)
4.9/5
(35)
A successful TQM program incorporates all EXCEPT which of the following?
(Multiple Choice)
4.9/5
(34)
Enlarging employee jobs so that the added responsibility and authority is moved to the lowest level possible in the organization is called ________.
(Essay)
4.9/5
(24)
One of the ways that just-in-time (or JIT)influences quality is that by reducing inventory,bad quality is exposed.
(True/False)
4.8/5
(35)
Showing 1 - 20 of 125