Exam 9: Layout Strategies
Exam 1: Operations and Productivity129 Questions
Exam 2: Operations Strategy in a Global Environment120 Questions
Exam 3: Project Management124 Questions
Exam 4: Forecasting141 Questions
Exam 5: Design of Goods and Services121 Questions
Exam 6: Managing Quality125 Questions
Exam 7: Process Strategy113 Questions
Exam 8: Location Strategies121 Questions
Exam 9: Layout Strategies146 Questions
Exam 10: Human Resources,job Design,and Work Measurement159 Questions
Exam 11: Supply Chain Management145 Questions
Exam 12: Inventory Management165 Questions
Exam 13: Aggregate Planning and Sop116 Questions
Exam 14: Material Requirements Planning Mrpand ERP113 Questions
Exam 15: Short-Term Scheduling116 Questions
Exam 16: Lean Operations116 Questions
Exam 17: Maintenance and Reliability114 Questions
Exam 18: Sustainability in the Supply Chain84 Questions
Exam 19: Statistical Process Control144 Questions
Exam 20: Capacity and Constraint Management101 Questions
Exam 21: Supply Chain Management Analytics67 Questions
Exam 22: Decision-Making Tools100 Questions
Exam 23: Linear Programming98 Questions
Exam 24: Transportation Models89 Questions
Exam 25: Waiting-Line Models119 Questions
Exam 26: Learning Curves110 Questions
Exam 27: Simulation75 Questions
Select questions type
Hemo-tech,Inc. ,a biomedical technology and research laboratory,produces a standard blood filtering device on an assembly-line basis.Six basic tasks are performed along the assembly line.The time to perform each task and the tasks that must immediately precede each task are in the table below.Twenty pumps per 450-minute day must be produced by the assembly line.
(a)Draw the network diagram of the precedence relationships.
(b)Identify the absolute minimum and maximum cycle times.
(c)What is the cycle time required to meet demand?
(d)What is the minimum number of workstations required to meet the schedule?
(e)Balance this line using the most following tasks heuristic.
(f)What is the efficiency of the line obtained in part (e)?
(g)Can the efficiency of this solution be improved? Explain.

Free
(Essay)
4.7/5
(31)
Correct Answer:
(a)The appropriate diagram appears below.
(b)The absolute minimum cycle time is 17.10 minutes (the longest operation).The absolute maximum cycle time is 42.80 minutes (the sum of all task times).
(c)The required cycle time is 450/20 = 22.5 minutes.
(d)The theoretical minimum number of stations is 42.8/22.5 = 1.90 or 2.
(e)The balanced line appears below.
(f)The line's efficiency is only 63.4%.
(g)There is idle time at all stations;removing the smallest amount of idle time (5.4 minutes)from all stations reduces the cycle time from 22.5 minutes to 17.1 minutes.The efficiency of the line rises to 83.4%.
A(n)________ is a special product-oriented arrangement of machines and personnel in what is ordinarily a process-oriented facility.
Free
(Essay)
4.9/5
(36)
Correct Answer:
work cell
For which of the following operations would a fixed-position layout be MOST appropriate?
(Multiple Choice)
4.9/5
(31)
What is cross-docking? What are some of its benefits for manufacturing facilities,distribution centers,and retailers such as Walmart?
(Essay)
4.9/5
(24)
The ________ uses non-numeric "closeness" ratings to determine which departments should be located near one another and which departments should be kept farther apart.
(Essay)
4.8/5
(34)
Explain what the purpose of assembly-line balancing is.Describe briefly how it is done.
(Essay)
4.7/5
(24)
Which one of the following is NOT common to repetitive and product-oriented layouts?
(Multiple Choice)
4.9/5
(34)
If the schedule calls for the production of 120 units per day and 480 minutes of production time are available per day,the cycle time would be 4 minutes.
(True/False)
4.8/5
(33)
One guideline for a retail layout is to locate high-draw items around the periphery of the store.
(True/False)
4.8/5
(35)
An electronics manufacturer makes remote control devices for interactive-cable-TV systems.The following assembly tasks must be performed on each device.
a.Draw the precedence diagram for this problem.
b.What is the sum of the task times?
c.What cycle time will allow the production of 200 units over a ten-hour day?
d.What is the theoretical number of workstations needed?
e.Balance this assembly line using the heuristic most following tasks and the heuristic longest operation time.
f.How do these two solutions differ? Which do you prefer;why?

(Essay)
4.8/5
(28)
A(n)________ addresses flow,allocates space,and responds to customer behavior.
(Essay)
4.8/5
(36)
The layout approach that addresses trade-offs between space and material handling is called the fixed-position layout.
(True/False)
4.9/5
(36)
An assembly line with 11 tasks is to be balanced.The longest task is 2.4 minutes,the shortest task is 0.4 minutes,and the sum of the task times is 18 minutes.The line will operate for 600 minutes per day.
(a)Determine the minimum and maximum cycle times.
(b)What range of output is theoretically possible for the line?
(c)What is the minimum number of stations needed if the maximum output rate is to be sought?
(d)What cycle time will provide an output rate of 200 units per day?
(Essay)
4.8/5
(40)
A process-oriented layout is the traditional way to support a product differentiation strategy.
(True/False)
4.8/5
(26)
There are three work centers (A,B,and C)behind the financial aid counter at a nearby university.They can each fit into any of three office spaces (1,2,and 3)off the corridor behind the desk.There is no student contact in these areas,only workers.The distance 1-2 is 20 feet,2-3 is 30 feet,and 1-3 is 50 feet.The matrix of work (trips per day)at the three centers are shown in the following table.Remember that each trip must be a round-trip (from 1 to 2 and back,for example).
(a)How many possible assignments are there? List them.
(b)Calculate the total distance traveled in each of these assignments.
(c)Which assignment minimizes distance traveled?

(Essay)
4.7/5
(31)
An assembly line has been designed to make battery-powered beverage mixers.Task details are shown in the table below:
a.What is the assigned cycle time (in minutes)?
b.What is the maximum output rate of this line in mixers per hour?
c.What is the total idle time per cycle?
d.What is the assembly line's efficiency?

(Essay)
4.8/5
(29)
In assembly-line balancing,the theoretical minimum number of workstations is:
(Multiple Choice)
4.8/5
(32)
If a layout problem is solved by use of heuristics,this means that:
(Multiple Choice)
4.8/5
(33)