Exam 9: Layout Strategies
Exam 1: Operations and Productivity126 Questions
Exam 2: Operations Strategy in a Global Environment135 Questions
Exam 3: Project Management121 Questions
Exam 4: Forecasting144 Questions
Exam 5: Sustainability in the Supply Chain and Design of Goods and Services137 Questions
Exam 6: Managing Quality129 Questions
Exam 7: Process Strategy and Sustainability131 Questions
Exam 8: Location Strategies139 Questions
Exam 9: Layout Strategies161 Questions
Exam 10: Human Resources,job Design,and Work Measurement192 Questions
Exam 11: Supply-Chain Management145 Questions
Exam 12: Inventory Management168 Questions
Exam 13: Aggregate Planning134 Questions
Exam 14: Material Requirements Planning Mrpand ERP169 Questions
Exam 15: Short-Term Scheduling139 Questions
Exam 16: Jit and Lean Operations137 Questions
Exam 17: Maintenance and Reliability130 Questions
Exam 18: Statistical Process Control156 Questions
Exam 19: Capacity and Constraint Management107 Questions
Exam 20: Supply Chain Management Analytics55 Questions
Exam 21: Decision-Making Tools97 Questions
Exam 22: Linear Programming100 Questions
Exam 23: Transportation Models94 Questions
Exam 24: Waiting-Line Models135 Questions
Exam 25: Learning Curves111 Questions
Exam 26: Simulation92 Questions
Select questions type
Which of the following does not support the retail layout objective of maximizing customer exposure to products?
(Multiple Choice)
4.9/5
(34)
Which of the statements below best describes office layout?
(Multiple Choice)
4.8/5
(41)
Departments A,B,C,and D need to be assigned to four rooms 1,2,3,and 4.These rooms are arranged in a row,in that order,with 20 meters between each.The departmental work flows are contained in the table below.
a.What is the material handling total of assigning A-1,B-2,C-3,D-4?
b.What is the material handling total of assigning A-1,B-3,C-4,D-2? 

(Essay)
4.9/5
(41)
What are the two basic types of product layouts? Explain how they are alike,and how they are different.
(Essay)
4.7/5
(37)
Which of the following layouts generally has the best machine utilization?
(Multiple Choice)
4.8/5
(40)
Which of the following is not one of the factors complicating the techniques for addressing the fixed position layout?
(Multiple Choice)
4.9/5
(40)
A product requires 24 separate tasks,and the sum of those task times is 14 minutes;if the cycle time is 2 minutes,then at least 12 workstations will be needed.
(True/False)
4.7/5
(34)
Heuristics are problem-solving procedures that mathematically optimize the solution.
(True/False)
4.7/5
(39)
Which of the following is not one of McDonald's "seven major innovations"?
(Multiple Choice)
4.8/5
(30)
If the schedule calls for the production of 120 units per day and 480 minutes of production time are available per day,the maximum cycle time would be 4 minutes.
(True/False)
4.7/5
(44)
The major problem addressed by the process-oriented layout strategy is
(Multiple Choice)
4.8/5
(36)
The objective of layout strategy is to develop an effective and efficient layout that will meet the firm's competitive requirements.
(True/False)
4.8/5
(36)
________ avoids placing materials or supplies in storage by processing them as they are received for shipment.
(Essay)
4.8/5
(39)
One of the major advantages of process-oriented layouts is
(Multiple Choice)
4.8/5
(45)
A work cell is required to make 140 computerized diagnostic assemblies (for installation into hybrid automobiles)each day.The cell currently works an eight hour shift,of which seven hours is available for productive work.These assemblies require five operations.Standard times for these operations are: Operation A,3.0 minutes,B,1.8 minutes,C,2.4 minutes,D,2.5 minutes,and E,1.4 minutes.What is takt time for this cell? How many workers will be needed to achieve this schedule? Use the grid below to construct a work balance chart for this cell. 

(Essay)
5.0/5
(41)
Utilization of the total "cube" is the dominant consideration in office layout.
(True/False)