Exam 14: Material Requirements Planning Mrp and Erp
Exam 1: Operations and Productivity126 Questions
Exam 2: Operations Strategy in a Global Environment135 Questions
Exam 3: Project Management123 Questions
Exam 4: Forecasting142 Questions
Exam 5: Design of Goods and Services137 Questions
Exam 6: Managing Quality130 Questions
Exam 7: Process Strategy129 Questions
Exam 8: Location Strategies140 Questions
Exam 9: Layout Strategies161 Questions
Exam 10: Human Resources, Job Design, and Work Measurement191 Questions
Exam 11: Supply-Chain Management145 Questions
Exam 12: Inventory Management171 Questions
Exam 13: Aggregate Planning134 Questions
Exam 14: Material Requirements Planning Mrp and Erp172 Questions
Exam 15: Short-Term Scheduling139 Questions
Exam 16: Just-In-Time and Lean Options138 Questions
Exam 17: Maintenance and Reliability130 Questions
Exam 18: Statistical Tools for Managers97 Questions
Exam 19: Acceptance Sampling99 Questions
Exam 20: The Simplex Method of Linear Programming94 Questions
Exam 21: The Modi and Vam Methods of Solving Transportation Problems135 Questions
Exam 22: Vehicle Routing and Scheduling111 Questions
Exam 23 Managing Quality155 Questions
Exam 24: Process Strategy107 Questions
Exam 25: Supply-Chain Management73 Questions
Exam 26: Vehicle Routing and Scheduling92 Questions
Select questions type
What lot-sizing technique is generally preferred when inventory holding costs are extremely high?
(Multiple Choice)
4.9/5
(26)
Which of the following statements regarding Wheeled Coach is false?
(Multiple Choice)
4.9/5
(32)
If 100 units of Q are needed and 10 are already in stock, then the gross requirement is 100 and the net requirement is 90.
(True/False)
4.8/5
(31)
The lot-for-lot lot-sizing technique is particularly appropriate when demand is not very smooth and set up cost is small compared to holding cost.
(True/False)
4.9/5
(32)
Which portion of the master production schedule is normally fixed, frozen, or firm?
(Multiple Choice)
4.9/5
(27)
MRP can be effective only if very accurate lot sizes are calculated in advance.
(True/False)
4.8/5
(41)
By convention, the top level in a bill of material is designated level 1.
(True/False)
4.8/5
(37)
The MPS calls for 110 units of Product M. There are currently 30 of Product M on hand. Each M requires 4 of Component N. There are 20 units of N on hand. The net requirements for N are
(Multiple Choice)
5.0/5
(37)
A grill assembly takes 20 washers. Instead of listing these washers separately they are grouped into a single kit for production. The bill of material for the washers is classified as
(Multiple Choice)
4.8/5
(35)
Each X requires 2 of component Y and 1 of part W. Each Y requires 10 of Z. Each W requires 3 of Q and 2 of R. Lead times are X = 1 week, Y = 1 week, W = 2 weeks, R = 1 week, Z = 3 weeks, and Q = 3 weeks.
a. Construct the time-phased product structure.
b. Construct the bill of material.
(Essay)
4.9/5
(37)
Describe briefly the information requirements of basic and extended MRP systems. Comment on the challenge of maintaining timely, accurate information for a large manufacturing operation based on MRP.
(Essay)
4.8/5
(36)
The supply-chain systems that result from using ERP in the grocery industry are called efficient consumer response (ECR) systems.
(True/False)
4.9/5
(30)
Linking a part requirement with the parent component that caused the requirement is referred to as
(Multiple Choice)
4.7/5
(26)
Four A washers, Five B washers, Two C bolts, and a D bolt are required to make one Grill parts kit. If 100 grill part kits are needed how many more washers will be consumed than bolts?
(Essay)
4.9/5
(32)
Which of the following is a step towards integrating JIT and MRP according to the text?
(Multiple Choice)
4.9/5
(34)