Exam 14: Material Requirements Planning Mrp and Erp

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Describe how MRP II differs from MRP.

(Essay)
4.8/5
(29)

Which of the following best differentiates material requirements planning (MRP) from finite capacity scheduling (FCS)?

(Multiple Choice)
4.8/5
(34)

Planning bills of material are bills of material for "kits" of inexpensive items such as washers, nuts, and bolts.

(True/False)
4.8/5
(37)

Distortion in MRP systems can be minimized when safety stock is held at the

(Multiple Choice)
4.8/5
(35)

The quantity required of a dependent demand item is computed from the demand for the final products in which the item is used.

(True/False)
4.8/5
(36)

An item's holding cost is 60 cents per week. Each setup costs $120. Lead time is 2 weeks. EPP is

(Multiple Choice)
4.9/5
(33)

Clancy's Motors has the following demand to meet for custom manufactured fuel injector parts. The holding cost for that item is $.75 per month and each setup costs $150. Calculate the order quantity by use of the part-period algorithm. Lead time is 2 months. Clancy's Motors has the following demand to meet for custom manufactured fuel injector parts. The holding cost for that item is $.75 per month and each setup costs $150. Calculate the order quantity by use of the part-period algorithm. Lead time is 2 months.

(Essay)
4.9/5
(32)

A bill of material lists the

(Multiple Choice)
4.8/5
(37)

Construct an indented bill of material for a common 3-ring view binder (the kind that lets you slip your own cover sheet into the front panel and spine). Assume the rings to be 1 inch diameter. Don't worry about other dimensions?pay attention to accounting for all of the parts.

(Essay)
4.7/5
(37)

A(n) __________ provides feedback to the capacity plan, master production schedule, and production plan so planning can be kept valid at all times.

(Short Answer)
4.7/5
(34)

The MPS calls for 110 units of Product A. There are currently 60 of Product A on hand. Each A requires 4 of Part B. There are 20 units of B available. The net requirements for B are

(Multiple Choice)
4.9/5
(40)

__________ refers to the time units in a material requirements planning (MRP) system.

(Short Answer)
4.8/5
(40)

Which of the following best describes a gross material requirements plan?

(Multiple Choice)
4.9/5
(34)

__________, unlike MRP, recognizes that departments and machines have limitations on their capacity that must be observed if the schedule is to be realistic.

(Short Answer)
4.8/5
(35)

A bill of material must be updated with the corrected dimensions of a part. The document that details this change is a(n)

(Multiple Choice)
4.9/5
(35)

By convention, the top level in a bill of material is

(Multiple Choice)
4.8/5
(32)

A material requirements plan contains information with regard to all of the following except

(Multiple Choice)
4.9/5
(38)

A product has the following gross requirements. Which is cheaper, lot-for-lot or EOQ lot-sizing? A product has the following gross requirements. Which is cheaper, lot-for-lot or EOQ lot-sizing?    Other data for this scenario include: setup cost = $1000, inventory holding cost $1 per unit per week. There is no beginning inventory; there are no scheduled receipts. The usage pattern is expected to continue for the remainder of the year. Other data for this scenario include: setup cost = $1000, inventory holding cost $1 per unit per week. There is no beginning inventory; there are no scheduled receipts. The usage pattern is expected to continue for the remainder of the year.

(Essay)
4.9/5
(31)

In MRP, a "bucket" refers to a fixed order quantity, such as an EOQ.

(True/False)
4.9/5
(38)

MRP II is accurately described as

(Multiple Choice)
4.9/5
(40)
Showing 61 - 80 of 172
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)