What is the "supermarket" as it is used in MRP? How does it alter the responsibility for dealing with lead-time offsets?

(Essay)
4.8/5
(37)

The following table is an example of a(n) The following table is an example of a(n)

(Multiple Choice)
4.8/5
(38)

Which of the following regarding enterprise resource planning (ERP) is true?

(Multiple Choice)
4.8/5
(42)

What does enterprise resource planning (ERP) allow an organization to do?

(Essay)
4.8/5
(32)

Given the following bill of material Given the following bill of material   If the demand for product A is 30 units, and there are 10 units of B on hand and none of C, how many units of part D will be needed? If the demand for product A is 30 units, and there are 10 units of B on hand and none of C, how many units of part D will be needed?

(Multiple Choice)
4.8/5
(40)

What is MRP? Identify four benefits from its use.

(Essay)
4.8/5
(44)

Jacquie Welkener, operations manager for ABC Technologies, must schedule work for the next five days. Each unit takes 30 minutes to process. Available capacity is 8 hours per day. The production order quantities are 12, 18, 20, 13, and 17 for Monday through Friday, respectively. What should be the production plan?

(Essay)
4.8/5
(40)

In job shop (make-to-order) operations, the master production schedule is usually expressed in

(Multiple Choice)
4.8/5
(34)

Capacity planning in closed-loop MRP

(Multiple Choice)
4.8/5
(38)

Firms making many different final products use __________ to facilitate production scheduling.

(Multiple Choice)
4.7/5
(34)

Which of the following is false concerning enterprise resource planning (ERP)?

(Multiple Choice)
4.9/5
(29)

The __________ is the input to material requirements planning which lists the assemblies, subassemblies, parts, and raw materials needed to produce one unit of finished product.

(Multiple Choice)
4.8/5
(38)

Which of the following statements regarding the gross material requirements plan is true?

(Multiple Choice)
4.7/5
(34)

Consider the following bill of material. Fifty units of Product A are needed. Assuming no on-hand inventory, and no scheduled receipts, explode the bill of material.

(Essay)
5.0/5
(27)

The MPS calls for 50 units of Product A and 60 of B. There are currently 35 of Product B on hand. Each A requires 2 of Part C; each B requires 5 of C. There are 160 units of C available. a. Calculate the net requirements for B. b. Calculate the gross requirements for C. c. Calculate the net requirements for C.

(Essay)
4.9/5
(34)

What does the part-period balancing lot-sizing technique attempt to do in deciding the lot sizes?

(Essay)
4.9/5
(40)

The __________ technique may be applicable where a firm's parts and subassemblies are common to a variety of its products.

(Short Answer)
4.8/5
(33)

The bill of material contains information necessary to

(Multiple Choice)
4.8/5
(36)

A process-focus facility (for example, a print shop) will likely schedule __________ as the focus of its master production schedule.

(Short Answer)
4.9/5
(40)

The minimum record accuracy required for successful MRP is approximately

(Multiple Choice)
4.9/5
(32)