Exam 14: Material Requirements Planning Mrp and Erp

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

When safety stock is deemed absolutely necessary, the usual policy is to build it into the projected on-hand inventory of the MRP logic.

(True/False)
4.9/5
(40)

Explain what is meant by "nervousness" of the MRP schedule. Provide an example. Name two tools that are particularly useful in reducing system nervousness in MRP systems.

(Essay)
4.8/5
(34)

Smoothing a resource requirements profile to stay within capacity limits may increase setup costs.

(True/False)
4.8/5
(35)

A dependent demand item is so called because its demand is dependent on customer preferences.

(True/False)
4.9/5
(34)

Describe finite capacity scheduling. How is it more realistic than MRP?

(Essay)
4.9/5
(26)

Low level coding means that

(Multiple Choice)
4.8/5
(38)

One of the tools that is particularly useful in reducing the system nervousness in the MRP system is (are)

(Multiple Choice)
4.8/5
(37)

The __________ is (are) the MRP input detailing which end items are to be produced, when they are needed, and in what quantities.

(Multiple Choice)
4.9/5
(38)

A document calls for the production of 50 small garden tractors in week 1; 50 small garden tractors and 100 riding mowers in week 2; 100 riding mowers and 200 garden utility carts in week 3; and 100 riding mowers in week 4. This document is most likely a(n)

(Multiple Choice)
4.8/5
(32)

In MRP, system nervousness is caused by

(Multiple Choice)
4.7/5
(35)

Gross material requirements do not take into account the amount of inventory on hand.

(True/False)
4.8/5
(38)

Operations splitting sends pieces to the next operation before the entire lot is completed on the previous operation.

(True/False)
4.9/5
(39)
Showing 161 - 172 of 172