Exam 9: Layout Strategies
Exam 1: Operations and Productivity127 Questions
Exam 2: Operations Strategy in a Global Environment119 Questions
Exam 3: Project Management120 Questions
Exam 4: Forecasting141 Questions
Exam 5: Design of Goods and Services118 Questions
Exam 6: Managing Quality127 Questions
Exam 7: Process Strategy108 Questions
Exam 8: Location Strategies120 Questions
Exam 9: Layout Strategies145 Questions
Exam 10: Human Resources,job Design,and Work Measurement154 Questions
Exam 11: Supply Chain Management145 Questions
Exam 12: Inventory Management163 Questions
Exam 13: Aggregate Planning and Sop116 Questions
Exam 14: Material Requirements Planning Mrpand Erp116 Questions
Exam 15: Short-Term Scheduling115 Questions
Exam 16: Jit,tps,and Lean Operations115 Questions
Exam 17: Maintenance and Reliability111 Questions
Exam 18: Sustainability in the Supply Chain80 Questions
Exam 19: Statistical Process Control144 Questions
Exam 20: Capacity and Constraint Management96 Questions
Exam 21: Supply Chain Management Analytics55 Questions
Exam 22: Decision-Making Tools96 Questions
Exam 23: Linear Programming88 Questions
Exam 24: Transportation Models89 Questions
Exam 25: Waiting-Line Models119 Questions
Exam 26: Learning Curves110 Questions
Exam 27: Simulation74 Questions
Select questions type
Servicescape refers to the physical surrounding in which the service is delivered.
(True/False)
4.9/5
(28)
________ avoids placing materials or supplies in storage by processing them as they are received for shipment.
(Essay)
4.8/5
(44)
Process-oriented layouts typically have low levels of work-in-process inventory.
(True/False)
4.8/5
(31)
"Having a focused work center is like having a plant within a plant." Discuss.Include in your discussion what conditions make focused work centers appropriate.
(Essay)
4.8/5
(42)
________ is the pace (frequency)of production necessary (time per unit)to meet customer orders.
(Essay)
4.8/5
(39)
What layout strategy deals with low-volume,high-variety production?
(Multiple Choice)
4.8/5
(34)
Cross-docking processes items as they are received,rather than placing them in storage.
(True/False)
4.9/5
(40)
Category management is the use of computer software to evaluate the profitability of various merchandising plans for hundreds of categories.
(True/False)
4.7/5
(38)
In assembly-line balancing,cycle time (the ratio of available production time to scheduled production)is the:
(Multiple Choice)
4.7/5
(38)
The most common tactic to arrange departments in a process-oriented layout is to minimize material handling costs.
(True/False)
4.8/5
(38)
If a layout problem is solved by use of heuristics,this means that:
(Multiple Choice)
4.9/5
(44)
A(n)________ is a special product-oriented arrangement of machines and personnel in what is ordinarily a process-oriented facility.
(Essay)
4.9/5
(43)
A production line is to be designed for a job with four tasks.The task times are 2.4 minutes,1.4 minutes,0.9 minutes,and 1.7 minutes.After line balancing,the largest possible assigned cycle time is ________ minutes,and the smallest possible assigned cycle time is ________ minutes.
(Multiple Choice)
4.9/5
(45)
Explain how a load-distance model helps solve problems in process layout.
(Essay)
4.8/5
(39)
An insurance claims processing center has six work centers,any of which can be placed into any of six physical departmental locations.Call the centers 1,2,3,4,5,and 6,and the departments A,B,C,D,E,and F.The current set of assignments is A-3,B-1,C-6,D-2,E-4,and F-5.
The (symmetric)matrix of departmental distances,in meters is shown below.
The matrix of work flow (estimated trips per day)is among centers is shown below.
The firm estimates that each trip costs approximately $4.What is the cost of the current assignment?


(Essay)
4.7/5
(36)
Solving a load-distance problem for a process-oriented layout requires that:
(Multiple Choice)
4.9/5
(40)
"A special arrangement of machinery and equipment to focus on production of a single product or group of related products" describes what layout type?
(Multiple Choice)
4.7/5
(41)
In the office relationship chart,which rating reflects the highest importance for two departments' closeness to each other?
(Multiple Choice)
4.9/5
(34)
A work cell is required to make 80 computerized diagnostic assemblies (for installation into hybrid automobiles)each day.The cell currently works an eight hour shift,of which seven hours are available for productive work.These assemblies require five operations,with times of 1.0,1.8,2.4,2.5,and 1.4 minutes each.(a)What is takt time for this cell? (b)How many workers will be needed?
(Essay)
5.0/5
(35)