Exam 16: Jit,tps,and Lean Operations
Exam 1: Operations and Productivity127 Questions
Exam 2: Operations Strategy in a Global Environment119 Questions
Exam 3: Project Management120 Questions
Exam 4: Forecasting141 Questions
Exam 5: Design of Goods and Services118 Questions
Exam 6: Managing Quality127 Questions
Exam 7: Process Strategy108 Questions
Exam 8: Location Strategies120 Questions
Exam 9: Layout Strategies145 Questions
Exam 10: Human Resources,job Design,and Work Measurement154 Questions
Exam 11: Supply Chain Management145 Questions
Exam 12: Inventory Management163 Questions
Exam 13: Aggregate Planning and Sop116 Questions
Exam 14: Material Requirements Planning Mrpand Erp116 Questions
Exam 15: Short-Term Scheduling115 Questions
Exam 16: Jit,tps,and Lean Operations115 Questions
Exam 17: Maintenance and Reliability111 Questions
Exam 18: Sustainability in the Supply Chain80 Questions
Exam 19: Statistical Process Control144 Questions
Exam 20: Capacity and Constraint Management96 Questions
Exam 21: Supply Chain Management Analytics55 Questions
Exam 22: Decision-Making Tools96 Questions
Exam 23: Linear Programming88 Questions
Exam 24: Transportation Models89 Questions
Exam 25: Waiting-Line Models119 Questions
Exam 26: Learning Curves110 Questions
Exam 27: Simulation74 Questions
Select questions type
What are the 5Ss? Why does the list of the 5Ss sometimes have seven elements?
(Essay)
4.8/5
(27)
Which of the following is specifically characterized by a focus on continuous improvement,respect for people,and standard work practices?
(Multiple Choice)
4.8/5
(37)
Which one of the following statements is TRUE about the kanban system?
(Multiple Choice)
4.8/5
(33)
Which of the following is TRUE regarding the steps to reducing setup times?
(Multiple Choice)
4.9/5
(39)
If the goals of JIT partnerships are met,which of the following is a result?
(Multiple Choice)
4.9/5
(33)
With level schedules,a few large batches,rather than frequent small batches,are processed.
(True/False)
4.8/5
(36)
Daily usage of an assembly is 100 in a facility that operates 300 days of the year.Setup cost is $5 and annualized carrying cost is $160.Production of this assembly occurs at the rate of 400 per day when production of the assembly is underway.Lead time is 3 days;safety stock is 1/2 day's production.What is the optimum kanban size,and number of kanbans?
(Essay)
4.8/5
(32)
What are the five reasons given by suppliers for their reluctance to enter into JIT systems?
(Essay)
4.8/5
(28)
A manufacturer took the following actions to reduce inventory.Which of these is generally not accepted as a JIT action?
(Multiple Choice)
4.8/5
(39)
Great Lakes Barge and Baggage Company makes,among other things,battery-operated bilge pumps.Which of the following activities is NOT part of JIT? They:
(Multiple Choice)
4.9/5
(31)
A certain product has been effectively managed in the past,according to its managers.The previous technique used the economic production quantity model,and resulted in an optimum lot size of 100.For this product,setup time is directly proportional to setup cost,and setup time is currently 40 minutes per batch.How much must setup time decline in order for the lot size to fall to 50 units? 25 units? 10 units?
(Essay)
4.9/5
(38)
Showing 101 - 115 of 115
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)