Exam 16: Jit,tps,and Lean Operations
Exam 1: Operations and Productivity127 Questions
Exam 2: Operations Strategy in a Global Environment119 Questions
Exam 3: Project Management120 Questions
Exam 4: Forecasting141 Questions
Exam 5: Design of Goods and Services118 Questions
Exam 6: Managing Quality127 Questions
Exam 7: Process Strategy108 Questions
Exam 8: Location Strategies120 Questions
Exam 9: Layout Strategies145 Questions
Exam 10: Human Resources,job Design,and Work Measurement154 Questions
Exam 11: Supply Chain Management145 Questions
Exam 12: Inventory Management163 Questions
Exam 13: Aggregate Planning and Sop116 Questions
Exam 14: Material Requirements Planning Mrpand Erp116 Questions
Exam 15: Short-Term Scheduling115 Questions
Exam 16: Jit,tps,and Lean Operations115 Questions
Exam 17: Maintenance and Reliability111 Questions
Exam 18: Sustainability in the Supply Chain80 Questions
Exam 19: Statistical Process Control144 Questions
Exam 20: Capacity and Constraint Management96 Questions
Exam 21: Supply Chain Management Analytics55 Questions
Exam 22: Decision-Making Tools96 Questions
Exam 23: Linear Programming88 Questions
Exam 24: Transportation Models89 Questions
Exam 25: Waiting-Line Models119 Questions
Exam 26: Learning Curves110 Questions
Exam 27: Simulation74 Questions
Select questions type
________ is the Japanese word for card that has come to mean "signal."
(Essay)
4.7/5
(33)
A product has annual demand of 100,000 units.The plant manager wants production to follow a four-hour cycle.Based on the following data,what setup cost will enable the desired production cycle? d = 400 per day (250 days per year),p = 4000 units per day,H = $40 per unit per year,and Q = 200 (demand for four hours,half a day).
(Multiple Choice)
4.8/5
(38)
A grocery store is attempting to implement a kanban system.Which of the following would not be an application of kanbans?
(Multiple Choice)
4.8/5
(27)
Handling material more than once is an example of the waste called ________.
(Essay)
5.0/5
(34)
A(n)________ is a concept that results in material being produced only when requested and moved to where it is needed just as it is needed.
(Essay)
4.7/5
(35)
Which of the following statements regarding a pull system is TRUE?
(Multiple Choice)
4.8/5
(34)
Which of the following is specifically characterized by continuous and forced problem solving via a focus on throughput and reduced inventory?
(Multiple Choice)
4.8/5
(34)
The 5S category ________ includes analysis to improve workflow and reduce wasted motion.
(Essay)
4.8/5
(33)
Kanban is associated with all EXCEPT which of the following?
(Multiple Choice)
4.8/5
(37)
The cook in a fast-food restaurant knows that 2 hamburger patties and an order of fries should be started for each car that is waiting in line.This is best an example of:
(Multiple Choice)
4.9/5
(39)
Characteristics of just-in-time partnerships do NOT include:
(Multiple Choice)
4.9/5
(33)
The quality management tool called poka-yoke is not relevant to JIT systems.
(True/False)
4.7/5
(35)
Which of the following is not characteristic of a TPS employee?
(Multiple Choice)
4.8/5
(34)
JIT suppliers have concerns that the JIT firm's demands for small lot sizes are simply a way of transferring holding cost from the JIT firm to the suppliers.
(True/False)
4.8/5
(33)
Excess bags of basic commodities such as flour and sugar that are stored in a restaurant's kitchen represent which of the following wastes?
(Multiple Choice)
4.8/5
(43)
The Toyota Production System requires that activities have built-in,automatic tests to signal problems.
(True/False)
4.9/5
(35)
Showing 61 - 80 of 115
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)