Exam 16: Jit,tps,and Lean Operations

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Variability in manufacturing can occur because engineering drawings or specifications are incomplete or inaccurate.

(True/False)
4.8/5
(35)

Which of the following is NOT an attribute of lean operations?

(Multiple Choice)
4.9/5
(33)

Just-in-time systems make demands on layouts,including the need for:

(Multiple Choice)
4.8/5
(24)

Which of the following is generally found in most lean environments?

(Multiple Choice)
4.8/5
(30)

Manufacturing cycle time is best defined as the:

(Multiple Choice)
4.8/5
(34)

Which one of the following is NOT a layout tactic in a JIT environment?

(Multiple Choice)
4.8/5
(32)

Level scheduling means producing at a constant rate,regardless of customer demands.

(True/False)
4.8/5
(39)

JIT makes quality cheaper because:

(Multiple Choice)
4.8/5
(33)

How are lean operations and the Toyota Production System (TPS)alike? How are they different?

(Essay)
5.0/5
(33)

A bakery uses 6 kanban containers that each hold 4 cakes.If safety stock is 2 cakes and lead time is 11 days,determine daily demand.

(Essay)
4.8/5
(32)

Which of the following is FALSE regarding the links between JIT and quality?

(Multiple Choice)
4.8/5
(31)

The 5Ss-sort/segregate,simplify/straighten,shine/sweep,standardize,and sustain/self discipline-are important to lean production because they act as a means to reduce waste.

(True/False)
4.8/5
(33)

A push system means providing the next station with exactly what is needed when it is needed.

(True/False)
4.8/5
(28)

If a factory wants to cut its current lot size in half,by what proportion must setup cost change?

(Multiple Choice)
4.9/5
(34)

A kanban system requires that the process has little variability in lead time because shortages impact the entire production system.

(True/False)
4.9/5
(31)

The first step in reducing setup times is the separation of setup into preparation activities and actual setup,so that as much work as possible can be done while the machine or process is operating.

(True/False)
4.8/5
(28)

________ allows manufacturing work cells and offices to be easily rearranged.

(Essay)
4.7/5
(29)

Which of the following is NOT a concern of suppliers as they prepare to enter into JIT partnerships?

(Multiple Choice)
4.9/5
(38)

Weekly usage of a product is 8 units.Since the plant operates 50 weeks per year,this leads to annual usage of 400 units.Setup cost is $40 and annualized carrying cost is $80.Weekly production of this product is 12 units.Lead time is four weeks,and safety stock is one week's production.What is optimal kanban size? What is the optimal number of kanbans?

(Essay)
4.7/5
(28)

A repetitive manufacturing firm is planning on level material use.The following information has been collected.Currently,the firm operates 250 days per year. A repetitive manufacturing firm is planning on level material use.The following information has been collected.Currently,the firm operates 250 days per year.    a.What is the setup cost,based on the desired lot size? b.What is the setup time,based on $40 per hour setup labor? a.What is the setup cost,based on the desired lot size? b.What is the setup time,based on $40 per hour setup labor?

(Essay)
4.8/5
(32)
Showing 41 - 60 of 115
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)