Exam 6: Quality and Process Improvement
Exam 1: Creating Customer Value through Operations128 Questions
Exam 2: Supply Chain Management171 Questions
Exam 3: Process Configuration137 Questions
Exam 4: Capacity145 Questions
Exam 5: Inventory Management177 Questions
Exam 6: Quality and Process Improvement240 Questions
Exam 7: Lean Systems158 Questions
Exam 8: Managing Projects153 Questions
Exam 9: Location and Layout217 Questions
Exam 10: Managing Demand and Forecasting189 Questions
Exam 11: Operations Planning and Scheduling138 Questions
Exam 12: Resource Planning174 Questions
Exam 13: Decision Making82 Questions
Exam 14: Financial Analysis41 Questions
Exam 15: Work Measurement98 Questions
Exam 16: Learning Curve Analysis44 Questions
Exam 17: Computer-Integrated Manufacturing53 Questions
Exam 18: Acceptance Sampling Plans71 Questions
Exam 19: Simulation36 Questions
Exam 20: Special Inventory Models33 Questions
Exam 21: Linear Programming57 Questions
Exam 22: Waiting Lines109 Questions
Select questions type
The additional time incurred if an item is rerouted to some previous operation(s)to correct a defect would be categorized as an internal failure cost of quality.
(True/False)
4.8/5
(37)
Quality engineering is an approach that involves combining engineering and statistical methods to reduce costs and improve quality by optimizing product design and manufacturing processes.
(True/False)
4.8/5
(37)
Table 6.1
Factors for Calculating Three-Sigma Limits for the -chart and R-chart
Size of Sample (n) Factor for UCL and LCL for X - Charts Factor for LCL for R - Charts Factor for UCL for R - Charts 2 1.880 0 3.267 3 1.023 0 2.575 4 0.729 0 2.282 5 0.577 0 2.115 6 0.483 0 2.004 7 0.419 0.076 1.924 8 0.373 0.136 1.864 9 0.397 0.184 1.816 10 0.308 0.233 1.777
Source: 1950 Manual on Quality Control of Materials, copyright
American Society for Testing Materials. Reprinted with permission.
-A milling operation has historically produced an average thickness of 0.005 inch with an average range of 0.0015 inch.Currently,the first three items from each batch of 20 are inspected.Use Table 6.1.What is the value of LCL if the sample size is increased to 6?
(Multiple Choice)
4.8/5
(28)
A product has three components with individual reliabilities of 0.85,0.92,and 0.95.What is the reliability of the product?
(Multiple Choice)
4.8/5
(33)
A manufacturer of silk inspects each bolt of material at the end of the manufacturing process.When the process is in control,it averages 11 defects per bolt.If a 2-sigma control limit is used,what is the upper control limit?
(Multiple Choice)
4.9/5
(36)
A company is interested in monitoring the variability in the weight of the fertilizer bags it produces.An appropriate control chart would be
(Multiple Choice)
5.0/5
(37)
The implementation of a total quality management program will most likely result in a(n)
(Multiple Choice)
4.8/5
(34)
The defect rate for a product has historically been about 2.0%.What are the upper and lower control chart limits if you wish to use a sample size of 100 and 3 sigma limits?
(Essay)
4.9/5
(42)
Process capability determines whether a process is capable of producing the product or services that customers demand.
(True/False)
4.9/5
(38)
Whose teachings regarding quality management emphasized the role of project teams to achieve periodic "breakthrough" improvements that provide dramatic gains to address chronic quality problems?
(Multiple Choice)
4.9/5
(36)
Which one of the following is a consequence of internal failures?
(Multiple Choice)
4.8/5
(38)
The central line on a p-chart is 0.50 with an UCL of 0.65 and a LCL of 0.35.The results of the next six samples are 0.60,0.37,0.45,0.48,0.53,and 0.62.What should you do?
(Multiple Choice)
4.8/5
(33)
Discuss the situations under which each of the following charts would be best: X-chart,p-chart,and c-chart.
(Essay)
4.8/5
(32)
Historically,the average proportion of defective bars has been 0.015.Samples will be of 100 bars each.Construct a p-chart using z = 3.Suppose a sample had 0.07 defective.What would you do?
(Multiple Choice)
4.9/5
(29)
A product is composed of four subsystems that have reliabilities of .999,.87,.98,and .99.What is the overall reliability of this product?
(Essay)
4.9/5
(33)
Table 6.1
Factors for Calculating Three-Sigma Limits for the -chart and R-chart
Size of Sample (n) Factor for UCL and LCL for X - Charts Factor for LCL for R - Charts Factor for UCL for R - Charts 2 1.880 0 3.267 3 1.023 0 2.575 4 0.729 0 2.282 5 0.577 0 2.115 6 0.483 0 2.004 7 0.419 0.076 1.924 8 0.373 0.136 1.864 9 0.397 0.184 1.816 10 0.308 0.233 1.777
Source: 1950 Manual on Quality Control of Materials, copyright
American Society for Testing Materials. Reprinted with permission.
-A milling operation has historically produced an average thickness of 0.005 inch with an average range of 0.015 inch.Currently,the first three items from each batch of 20 are inspected.Use Table 6.1.What is the value of the LCL ?
(Multiple Choice)
4.8/5
(42)
Customers assess quality solely on the basis of how goods and services conform to design specifications and associated operating characteristics.
(True/False)
4.8/5
(37)
Showing 61 - 80 of 240