What are the benefits to using a Project Cost-Duration Graph to assist in comparing any proposed alternative or change with the current baseline?

(Essay)
4.8/5
(31)

The cost slope of an activity is calculated by dividing the run by the rise.

(True/False)
4.8/5
(37)

The Snapshot from Practice "Cell-Phone Wars" is an excellent example of reducing project duration due to:

(Multiple Choice)
4.8/5
(42)

Subtracting an activity's crash time from the normal time will calculate an activity's ________.

(Short Answer)
4.9/5
(37)

One of the advantages of using a Project Cost-Duration Graph is that it keeps the importance of indirect costs in the forefront of decision making.

(True/False)
4.8/5
(33)

Creating a Project Cost-Duration graph is useful:

(Multiple Choice)
4.8/5
(34)

Adverse weather, design flaws, and equipment breakdown can create negative slack.This is an example of reducing project duration caused by:

(Multiple Choice)
4.8/5
(42)

Which of the following is not one of the techniques for accelerating project completion?

(Multiple Choice)
4.9/5
(38)

The accuracy of crash times and costs is frequently rough at best, when compared with normal time and cost.

(True/False)
4.9/5
(36)

The ________ project cost is the sum of the indirect and direct costs.

(Short Answer)
4.8/5
(46)

In the "I'll Bet You..." Snapshot from Practice, the draftsman won ___________ for making a very difficult deadline.

(Short Answer)
4.8/5
(36)

Total project costs include all of the following except:

(Multiple Choice)
4.8/5
(39)

Costs such as labor, materials, equipment, or contractors are examples of ________ project costs.

(Short Answer)
4.8/5
(40)

The optimum duration for a project is at the point where:

(Multiple Choice)
4.8/5
(37)

The relationship between cost and time for various durations is assumed to be:

(Multiple Choice)
4.8/5
(38)

Shortening an activity is called ________.

(Short Answer)
4.9/5
(37)

How would you calculate an activity's slope and what does it represent?

(Essay)
4.9/5
(35)

Expected time for an activity represents low-cost, realistic, efficient methods for completing the activity under anticipated conditions.

(True/False)
4.8/5
(42)

The ________ time for an activity represents low-costs, realistic, efficient methods for completing the activity under typical conditions.

(Short Answer)
4.9/5
(39)

___________ is probably the most common response for meeting unattainable deadlines.

(Short Answer)
4.8/5
(41)