Exam 8: Scheduling Resources and Costs

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

In reviewing the status of her project with top management, Shirley was told that there only were two programmers that she could use for her project.Her project is __________ constrained.

(Multiple Choice)
4.8/5
(29)

In the Botanical Garden example, which of the following was used to solve the resource problem?

(Multiple Choice)
4.8/5
(28)

Identify the potential impacts of project constraints.

(Essay)
4.8/5
(41)

Without a time-phased budget good project schedule and cost control are impossible.

(True/False)
4.9/5
(47)

The top priority in using heuristics to allocate scare resources is those activities with the smallest duration.

(True/False)
4.9/5
(34)

A(n) ________ constraint addresses the sequence in which project activities must occur.

(Short Answer)
4.9/5
(37)

In scheduling terms, ________ constrained means that a specific resource is fixed and the duration of the project is flexible.

(Short Answer)
4.9/5
(29)

Scheduling time-constrained projects focuses on resource

(Multiple Choice)
4.8/5
(37)

All resource leveling techniques involve

(Multiple Choice)
4.8/5
(33)

If three copiers are needed to produce a final report on time and only two are available, the project is facing a(n) ________ type of resource constraint.

(Short Answer)
5.0/5
(29)
Showing 81 - 90 of 90