Project budgets are developed by time-phasing which of the following?

(Multiple Choice)
4.9/5
(28)

Resource leveling is only used on projects which are resource-constrained.

(True/False)
4.9/5
(32)

In a resource-constrained project the second priority in assigning resources is usually given to activities with the

(Multiple Choice)
4.8/5
(30)

What are the disadvantages of resource leveling?

(Essay)
4.9/5
(31)

Hector wants to bring on another programmer to work on the project but the company does not have anyone who has the needed skills.Hector's project is facing a(n) ________ constraint.

(Short Answer)
5.0/5
(35)

In a resource-constrained project, the first priority in assigning resources is usually given to activities with the

(Multiple Choice)
4.9/5
(30)

Delaying noncritical activities to lower peak demand and, thus, increase resource utilization is called _______ leveling.

(Short Answer)
4.8/5
(35)

Sam the project engineer has been scheduled to run the product system test at the same time he is to build a marketing prototype.This is an example of a ______ constraint.

(Multiple Choice)
4.7/5
(32)

Scheduling activities in a constrained project typically has ________ as the top heuristic rule.

(Short Answer)
4.8/5
(31)

Trying to renovate a ship compartment that is too small for more than one person is an example of a(n) ________ constraint.

(Short Answer)
4.8/5
(38)

Identify and give an example of the three types of resource constraints.

(Essay)
4.8/5
(38)

Susan is to conduct environmental testing but the chamber cannot hold all the equipment that she wants to test.This is an example of a _________ constraint.

(Multiple Choice)
4.9/5
(33)

A project cost baseline is also called __________.

(Short Answer)
4.8/5
(32)

In a resource-constrained project, which of the following is most likely to be changed?

(Multiple Choice)
5.0/5
(38)

Which of the following is not one of the types of project constraints?

(Multiple Choice)
4.8/5
(31)

Why would a project manager use heuristics rather than a mathematical solution to level resources?

(Essay)
4.8/5
(26)

All leveling techniques delay noncritical activities by using ________ to reduce peak demand.

(Short Answer)
4.8/5
(33)

A project budget report is showing our project as spending $35,000 against a budgeted amount of $40,000.Which of the following is true?

(Multiple Choice)
4.8/5
(43)

Many companies are using outsourcing as a means for dealing with their resource allocation problems associated with managing multiproject resources.

(True/False)
4.9/5
(35)

Without a time-phased __________ good project schedule and cost control are impossible.

(Short Answer)
4.7/5
(31)