Exam 20: Statistical Process Control
Exam 1: Operations and Productivity126 Questions
Exam 2: Operations Strategy in a Global Environment119 Questions
Exam 3: Project Management120 Questions
Exam 4: Forecasting141 Questions
Exam 5: Design of Goods and Services118 Questions
Exam 6: Managing Quality123 Questions
Exam 7: Process Strategy108 Questions
Exam 8: Capacity and Constraint Management96 Questions
Exam 9: Location Strategies120 Questions
Exam 10: Layout Strategies146 Questions
Exam 11: Human Resources, job Design, and Work Measurement154 Questions
Exam 12: Supply Chain Management144 Questions
Exam 13: Inventory Management163 Questions
Exam 14: Aggregate Planning and Sop116 Questions
Exam 15: Material Requirements Planning Mrpand Erp113 Questions
Exam 16: Short-Term Scheduling116 Questions
Exam 17: Jit, tps, and Lean Operations115 Questions
Exam 18: Maintenance and Reliability111 Questions
Exam 19: Sustainability in the Supply Chain80 Questions
Exam 20: Statistical Process Control144 Questions
Exam 21: Supply Chain Management Analytics55 Questions
Exam 22: Decision-Making Tools97 Questions
Exam 23: Linear Programming80 Questions
Exam 24: Transportation Models89 Questions
Exam 25: Waiting-Line Models119 Questions
Exam 26: Learning Curves105 Questions
Exam 27: Simulation75 Questions
Select questions type
A p-chart is appropriate to plot the number of typographic errors per page of text.
(True/False)
4.9/5
(32)
The probability of rejecting a good lot is known as consumer's risk.
(True/False)
4.9/5
(38)
What is the difference between the process capability ratio Cp and the process capability index Cpk?
(Essay)
4.8/5
(39)
In statistical process control,the range is often used as a substitute for the standard deviation.
(True/False)
5.0/5
(46)
An acceptance sampling plan must define "good lots" and "bad lots" and specify the risk level associated with each one.
(True/False)
4.8/5
(32)
Averages of small samples,not individual measurements,are generally used in statistical process control.
(True/False)
4.8/5
(44)
Repeated sampling of a certain process shows the average of all sample ranges to be 1.0 cm.The sample size has been constant at n = 5.What are the 3-sigma control limits for this R-chart?
(Short Answer)
4.9/5
(44)
Up to three standard deviations above or below the centerline is the amount of variation that statistical process control allows for:
(Multiple Choice)
4.9/5
(32)
Which of the following is true regarding the relationship between AOQ and the true population percent defective?
(Multiple Choice)
4.8/5
(36)
What is the difference between natural and assignable causes of variation?
(Essay)
4.8/5
(35)
Which of the following statements about acceptance sampling is TRUE?
(Multiple Choice)
4.8/5
(36)
The x-bar chart,like the c-chart,is based on the exponential distribution.
(True/False)
4.8/5
(35)
A process is operating in such a manner that the mean of the process is exactly on the lower specification limit.What must be true about the two measures of capability for this process?
(Essay)
4.8/5
(35)
In acceptance sampling,a manager can reach the wrong conclusion if the sample is not representative of the population it was drawn from.
(True/False)
4.9/5
(43)
Showing 41 - 60 of 144
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)