Exam 20: Statistical Process Control

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A p-chart is appropriate to plot the number of typographic errors per page of text.

(True/False)
4.9/5
(32)

Why do range charts exist? Aren't x-bar charts enough?

(Essay)
4.7/5
(41)

What is the purpose of the Operating Characteristics curve?

(Essay)
4.9/5
(32)

The probability of rejecting a good lot is known as consumer's risk.

(True/False)
4.9/5
(38)

What is the difference between the process capability ratio Cp and the process capability index Cpk?

(Essay)
4.8/5
(39)

In statistical process control,the range is often used as a substitute for the standard deviation.

(True/False)
5.0/5
(46)

An acceptance sampling plan must define "good lots" and "bad lots" and specify the risk level associated with each one.

(True/False)
4.8/5
(32)

Averages of small samples,not individual measurements,are generally used in statistical process control.

(True/False)
4.8/5
(44)

What does it mean for a process to be "capable"?

(Essay)
4.8/5
(36)

Repeated sampling of a certain process shows the average of all sample ranges to be 1.0 cm.The sample size has been constant at n = 5.What are the 3-sigma control limits for this R-chart?

(Short Answer)
4.9/5
(44)

The c-chart signals whether there has been a:

(Multiple Choice)
4.7/5
(41)

The ________ -chart is the chief way to control attributes.

(Short Answer)
4.7/5
(32)

Consumer's risk is the probability of:

(Multiple Choice)
4.8/5
(40)

Up to three standard deviations above or below the centerline is the amount of variation that statistical process control allows for:

(Multiple Choice)
4.9/5
(32)

Which of the following is true regarding the relationship between AOQ and the true population percent defective?

(Multiple Choice)
4.8/5
(36)

What is the difference between natural and assignable causes of variation?

(Essay)
4.8/5
(35)

Which of the following statements about acceptance sampling is TRUE?

(Multiple Choice)
4.8/5
(36)

The x-bar chart,like the c-chart,is based on the exponential distribution.

(True/False)
4.8/5
(35)

A process is operating in such a manner that the mean of the process is exactly on the lower specification limit.What must be true about the two measures of capability for this process?

(Essay)
4.8/5
(35)

In acceptance sampling,a manager can reach the wrong conclusion if the sample is not representative of the population it was drawn from.

(True/False)
4.9/5
(43)
Showing 41 - 60 of 144
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)