Exam 20: Statistical Process Control
Exam 1: Operations and Productivity126 Questions
Exam 2: Operations Strategy in a Global Environment119 Questions
Exam 3: Project Management120 Questions
Exam 4: Forecasting141 Questions
Exam 5: Design of Goods and Services118 Questions
Exam 6: Managing Quality123 Questions
Exam 7: Process Strategy108 Questions
Exam 8: Capacity and Constraint Management96 Questions
Exam 9: Location Strategies120 Questions
Exam 10: Layout Strategies146 Questions
Exam 11: Human Resources, job Design, and Work Measurement154 Questions
Exam 12: Supply Chain Management144 Questions
Exam 13: Inventory Management163 Questions
Exam 14: Aggregate Planning and Sop116 Questions
Exam 15: Material Requirements Planning Mrpand Erp113 Questions
Exam 16: Short-Term Scheduling116 Questions
Exam 17: Jit, tps, and Lean Operations115 Questions
Exam 18: Maintenance and Reliability111 Questions
Exam 19: Sustainability in the Supply Chain80 Questions
Exam 20: Statistical Process Control144 Questions
Exam 21: Supply Chain Management Analytics55 Questions
Exam 22: Decision-Making Tools97 Questions
Exam 23: Linear Programming80 Questions
Exam 24: Transportation Models89 Questions
Exam 25: Waiting-Line Models119 Questions
Exam 26: Learning Curves105 Questions
Exam 27: Simulation75 Questions
Select questions type
A retail store manager is trying to improve and control the rate at which cashiers sign customers up
for store credit cards.The manager takes several samples of size 50.He finds that each sample of 50 contained 5 credit card signups on average.Find p-bar and 99.73% control limits.
(Essay)
4.8/5
(31)
An operator trainee is attempting to monitor a filling process that has an overall average of 705 cc.The average range is 17 cc.If you use a sample size of 6,what are the upper and lower control limits for the x-bar chart and R-chart?
(Essay)
4.8/5
(40)
The number of defects after a hotel room cleaning (sheets not straight,smears on mirror,missed debris on carpet,etc)should be measured using what type of control chart?
(Multiple Choice)
4.7/5
(36)
If the process average is in control,then the process range must also be in control.
(True/False)
4.8/5
(44)
The specifications for a manifold gasket that installs between two engine parts calls for a thickness of 2.500 mm ± .020 mm.The standard deviation of the process is estimated to be 0.004 mm.The process is currently operating at a mean thickness of 2.50 mm.(a)What are the upper and lower specification limits for this product? (b)What is the Cp for this process? (c)About what percent of all units of this gasket will meet specifications? Does this meet the technical definition of Six Sigma?
(Essay)
4.9/5
(31)
Pierre's Motorized Pirogues and Mudboats is setting up an acceptance sampling plan for the special air cleaners he manufactures for his boats.His specifications,and the resulting plan,are shown on the POM for Windows output below.In relatively plain English (someone else will translate for Pierre),explain exactly what he will do when performing the acceptance sampling procedure,and what actions he might take based on the results. 

(Essay)
4.8/5
(29)
A normal distribution is generally described by its two parameters: the mean and the range.
(True/False)
4.9/5
(39)
An acceptance sampling plan is to be designed to meet the organization's targets for product quality and risk levels.Which of the following is true?
(Multiple Choice)
4.9/5
(28)
The ________ is a quality control chart used to control the number of defects per unit of output.
(Short Answer)
4.9/5
(39)
An x-bar control chart was examined and no data points fell outside of the limits.Can this process be considered in control?
(Multiple Choice)
4.8/5
(30)
At your first job out of college you have been assigned to the production of bottled 20 oz.soda.
The process has upper and lower spec limits of 20.5 and 19.5 oz,respectively,with a mean of 19.8 oz
and standard deviation of .1 oz.Your manager has requested the process produce no more than 3.4
defects per 1 million bottles produced.Calculate Cpk and then determine if the process is capable according to the manager's standard.
(Essay)
4.8/5
(26)
The specifications for a manifold gasket that installs between two engine parts calls for a thickness of 2.500 mm ± .020 mm.The standard deviation of the process is estimated to be 0.004 mm.The process is currently operating at a mean thickness of 2.50 mm.(a)What are the upper and lower specification limits for this product? (b)What is the Cp for this process? (c)The purchaser of these parts requires a capability index of 1.50.Is this process capable? Is this process good enough for the supplier? (d)If the process mean were to drift from its setting of 2.500 mm to a new mean of 2.497,would the process still be good enough for the supplier's needs?
(Essay)
4.7/5
(38)
A Cp value of 1.33 indicates a standard of how many standard deviations (sigmas)?
(Multiple Choice)
4.9/5
(26)
Acceptance sampling accepts or rejects an entire lot based on the information contained in the sample.
(True/False)
4.8/5
(40)
The ________ is a quality control chart that indicates when changes occur in the central tendency of a production process.
(Short Answer)
4.8/5
(36)
Control charts for variables are based on data that come from:
(Multiple Choice)
4.8/5
(29)