Exam 16: Lean Operations
Exam 1: Operations and Productivity129 Questions
Exam 2: Operations Strategy in a Global Environment120 Questions
Exam 3: Project Management124 Questions
Exam 4: Forecasting141 Questions
Exam 5: Design of Goods and Services121 Questions
Exam 6: Managing Quality125 Questions
Exam 7: Process Strategy113 Questions
Exam 8: Location Strategies121 Questions
Exam 9: Layout Strategies146 Questions
Exam 10: Human Resources,job Design,and Work Measurement159 Questions
Exam 11: Supply Chain Management145 Questions
Exam 12: Inventory Management165 Questions
Exam 13: Aggregate Planning and Sop116 Questions
Exam 14: Material Requirements Planning Mrpand ERP113 Questions
Exam 15: Short-Term Scheduling116 Questions
Exam 16: Lean Operations116 Questions
Exam 17: Maintenance and Reliability114 Questions
Exam 18: Sustainability in the Supply Chain84 Questions
Exam 19: Statistical Process Control144 Questions
Exam 20: Capacity and Constraint Management101 Questions
Exam 21: Supply Chain Management Analytics67 Questions
Exam 22: Decision-Making Tools100 Questions
Exam 23: Linear Programming98 Questions
Exam 24: Transportation Models89 Questions
Exam 25: Waiting-Line Models119 Questions
Exam 26: Learning Curves110 Questions
Exam 27: Simulation75 Questions
Select questions type
Great Lakes Barge and Baggage Company makes,among other things,battery-operated bilge pumps.Which of the following activities is NOT part of JIT? They:
(Multiple Choice)
4.9/5
(38)
Just-in-time systems make demands on layouts,including the need for:
(Multiple Choice)
4.8/5
(38)
JIT suppliers have concerns that the JIT firm's demands for small lot sizes are simply a way of transferring holding cost from the JIT firm to the suppliers.
(True/False)
4.8/5
(46)
A certain product has been effectively managed in the past,according to its managers.The previous technique used the economic production quantity model,and resulted in an optimum lot size of 100.For this product,setup time is directly proportional to setup cost,and setup time is currently 40 minutes per batch.How much must setup time decline in order for the lot size to fall to 50 units? 25 units? 10 units?
(Essay)
4.9/5
(39)
Lead time for computers is 5 days with daily demand of 25 and safety stock of 5 computers.If management wants to use 10 kanbans how many computers should each one hold?
(Multiple Choice)
4.8/5
(43)
A bakery uses 6 kanban containers that each hold 4 cakes.If safety stock is 2 cakes and lead time is 11 days,determine daily demand.
(Essay)
4.7/5
(34)
The quality management tool called poka-yoke is not relevant to JIT systems.
(True/False)
4.8/5
(33)
Which of the following is specifically characterized by continuous and forced problem solving via a focus on throughput and reduced inventory?
(Multiple Choice)
4.9/5
(33)
When implemented as a comprehensive operations strategy,JIT,TPS,and lean systems sustain competitive advantage and result in increased overall returns.
(True/False)
4.9/5
(38)
Employee empowerment is unnecessary in the Toyota Production System,because automation and powerful information systems reduce the need for employee creativity and decision making.
(True/False)
4.8/5
(38)
Who is credited with coining the phrase,"Inventory is evil"?
(Multiple Choice)
4.7/5
(41)
Which of the following is FALSE regarding the links between JIT and quality?
(Multiple Choice)
5.0/5
(43)
One goal of JIT partnerships is the removal of in-plant inventory by delivery in small lots directly to the using department as needed.
(True/False)
4.8/5
(35)
________ is the Japanese word for card that has come to mean "signal."
(Essay)
5.0/5
(39)
Characteristics of just-in-time partnerships do NOT include:
(Multiple Choice)
4.8/5
(37)
A push system means providing the next station with exactly what is needed when it is needed.
(True/False)
4.8/5
(37)
Showing 41 - 60 of 116
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)