If a factory wants to cut its current lot size in half,by what proportion must setup cost change?

(Multiple Choice)
4.9/5
(39)

Kanban is associated with all EXCEPT which of the following?

(Multiple Choice)
4.9/5
(34)

The 5Ss:

(Multiple Choice)
4.9/5
(30)

________ allows manufacturing work cells and offices to be easily rearranged.

(Essay)
4.8/5
(37)

The cook in a fast-food restaurant knows that 2 hamburger patties and an order of fries should be started for each car that is waiting in line.This is best an example of:

(Multiple Choice)
4.8/5
(33)

Daily usage of an assembly is 100 in a facility that operates 300 days of the year.Setup cost is $5 and annualized carrying cost is $160.Production of this assembly occurs at the rate of 400 per day when production of the assembly is underway.Lead time is 3 days;safety stock is 1/2 day's production.What is the optimum kanban size,and number of kanbans?

(Essay)
4.8/5
(38)

Identify the inventory tactics appropriate for a JIT environment.

(Essay)
4.8/5
(43)

The first step in reducing setup times is the separation of setup into preparation activities and actual setup,so that as much work as possible can be done while the machine or process is operating.

(True/False)
4.7/5
(37)

Which of the following is NOT a source of variability?

(Multiple Choice)
4.8/5
(37)

Labor cost for set-up is $500/hour.If the plant plans on level material use and operates 50 days per year,determine the time it takes to setup. Labor cost for set-up is $500/hour.If the plant plans on level material use and operates 50 days per year,determine the time it takes to setup.

(Essay)
4.8/5
(37)

A firm wants to develop a level material use schedule based on the following data.What should be the setup cost? A firm wants to develop a level material use schedule based on the following data.What should be the setup cost?

(Multiple Choice)
4.9/5
(39)

Product storage is an example of waste in the sense that no value is added.

(True/False)
4.8/5
(47)

Which one of the following is a characteristic of a JIT partnership?

(Multiple Choice)
4.8/5
(37)

A grocery store is attempting to implement a kanban system.Which of the following would not be an application of kanbans?

(Multiple Choice)
4.7/5
(36)

Lead time for cakes is 2 days with daily demand of 10 cakes and a safety stock of ½ a day.Each container (kanban)holds 1 cake.What is the correct number of kanbans?

(Multiple Choice)
4.9/5
(40)

A kanban system requires that the process has little variability in lead time because shortages impact the entire production system.

(True/False)
4.8/5
(36)