Exam 9: Layout Strategies

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A fabrication line and an assembly line are both types of repetitive and product-focused layout,but only the fabrication line utilizes workstations.

(True/False)
4.9/5
(36)

A big advantage of a process-oriented layout is:

(Multiple Choice)
4.7/5
(33)

The project remains in one place and workers and equipment come to that one work area in a(n)________ layout.

(Essay)
4.7/5
(37)

Which of the statements below best describes office layout?

(Multiple Choice)
4.9/5
(41)

A production line is to be designed for a job with four tasks.The task times are 2.4 minutes,1.4 minutes,0.9 minutes,and 1.7 minutes.After line balancing,the largest possible assigned cycle time is ________ minutes,and the smallest possible assigned cycle time is ________ minutes.

(Multiple Choice)
4.9/5
(37)

Four hundred and eighty minutes of production time are available per day.The schedule calls for the production of 80 units per day.Each unit of the product requires 30 minutes of work.What is the theoretical minimum number of workstations?

(Multiple Choice)
4.7/5
(32)

Cross-docking processes items as they are received,rather than placing them in storage.

(True/False)
4.9/5
(34)

Which of the following is a disadvantage of product-oriented layout?

(Multiple Choice)
4.9/5
(34)

Which of the following is NOT one of the factors complicating the techniques for addressing the fixed-position layout?

(Multiple Choice)
4.8/5
(33)

Identify the four requirements for cellular production.

(Essay)
4.9/5
(43)

Process-oriented layouts typically have low levels of work-in-process inventory.

(True/False)
4.9/5
(32)

Product-oriented layouts tend to have high levels of work-in-process inventories.

(True/False)
4.8/5
(28)

An assembly line is assigned as follows.Station 1- task A,B,and C.Station 2- task D.Station 3- task E and F.The task times are 7,3,2,9,4,and 5 minutes respective to A,B,C,D,E,and F.(Assume that there is no precedence relationship between the tasks,i.e. ,they can be performed in any order) (a)Calculate the efficiency. (b)What would the assignment of tasks to stations be using the shortest processing time heuristic (assuming the current maximum station time remains the cycle time)?

(Essay)
5.0/5
(38)

Workspace can inspire informal and productive encounters if it balances what three physical and social aspects?

(Multiple Choice)
4.8/5
(35)

Because problems with fixed-position layouts are so difficult to solve well onsite,operations managers:

(Multiple Choice)
4.8/5
(45)

A process layout problem consists of 4 departments,each of which can be assigned to one of four rooms.The number of different solutions to this problem is ________,although all of them may not have different material handling costs.

(Multiple Choice)
4.8/5
(43)

The most common tactic to arrange departments in a process-oriented layout is to minimize material handling costs.

(True/False)
4.8/5
(39)

Four hundred and eighty minutes of production time are available per day.Scheduled production is 120 units per day.What is the required cycle time?

(Multiple Choice)
4.8/5
(36)

An insurance claims processing center has six work centers,any of which can be placed into any of six physical departmental locations.Call the centers 1,2,3,4,5,and 6,and the departments A,B,C,D,E,and F.The current set of assignments is A-3,B-1,C-6,D-2,E-4,and F-5. The (symmetric)matrix of departmental distances,in meters is shown below. An insurance claims processing center has six work centers,any of which can be placed into any of six physical departmental locations.Call the centers 1,2,3,4,5,and 6,and the departments A,B,C,D,E,and F.The current set of assignments is A-3,B-1,C-6,D-2,E-4,and F-5. The (symmetric)matrix of departmental distances,in meters is shown below.    The matrix of work flow (estimated trips per day)is among centers is shown below.    The firm estimates that each trip costs approximately $4.What is the cost of the current assignment? The matrix of work flow (estimated trips per day)is among centers is shown below. An insurance claims processing center has six work centers,any of which can be placed into any of six physical departmental locations.Call the centers 1,2,3,4,5,and 6,and the departments A,B,C,D,E,and F.The current set of assignments is A-3,B-1,C-6,D-2,E-4,and F-5. The (symmetric)matrix of departmental distances,in meters is shown below.    The matrix of work flow (estimated trips per day)is among centers is shown below.    The firm estimates that each trip costs approximately $4.What is the cost of the current assignment? The firm estimates that each trip costs approximately $4.What is the cost of the current assignment?

(Essay)
4.9/5
(41)

What are the advantages and disadvantages of product-oriented layouts?

(Essay)
4.8/5
(35)
Showing 21 - 40 of 146
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)