Exam 9: Layout Strategies

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

ASRS stands for which of the following?

(Multiple Choice)
4.8/5
(34)

Cycle time is computed as:

(Multiple Choice)
4.9/5
(39)

Brandon's computer shop has hired a consultant to help apply operations management techniques to increase profits.Currently the shop sells most of its computers to a high-end customized online retailer and sales are steady at 250 per month.A single work cell produces the computers.To produce the computer,three operations are required.First the parts must be assembled,next software must be installed,and finally the computer must be safely packed and labeled for shipping.These operations take 2 hours,5 hours,and 1 hour respectively.If there are 6 available work hours each day and the shop operates 20 days per month find: (a)the takt time,and (b)the number of workers Brandon should hire.

(Essay)
4.9/5
(47)

Which of the following reduces product handling,inventory,and facility costs,but requires both (1)tight scheduling and (2)accurate inbound product information?

(Multiple Choice)
4.7/5
(29)

Which of the following does NOT support the retail layout objective of maximizing customer exposure to products?

(Multiple Choice)
5.0/5
(39)

A production line is to be designed to make 500 El-More dolls per day.Each doll requires 11 activities totaling 16 minutes of work.The factory operates 750 minutes per day.What is the required cycle time for this assembly line?

(Multiple Choice)
4.9/5
(39)

An airport is trying to balance where to place the three subgroups (local (A),regional (B),and national (C))for an airline.The distance between terminals and the number of trips that travelers make between subgroups for flight connections per day are listed.Find the assignment that minimizes the distance travelers must walk. An airport is trying to balance where to place the three subgroups (local (A),regional (B),and national (C))for an airline.The distance between terminals and the number of trips that travelers make between subgroups for flight connections per day are listed.Find the assignment that minimizes the distance travelers must walk.

(Essay)
4.8/5
(37)

Which of the following is NOT a heuristic rule for assigning tasks to workstations in a product layout?

(Multiple Choice)
4.9/5
(41)

Retail layouts are based on the notion that:

(Multiple Choice)
4.7/5
(28)

Which of the following is TRUE of random stocking?

(Multiple Choice)
4.8/5
(41)

Heuristics are problem-solving procedures that mathematically optimize the solution.

(True/False)
4.9/5
(41)

Which of the following is NOT one of the requirements of cellular production?

(Multiple Choice)
4.8/5
(35)

The biggest advantage of a product layout is its flexibility to handle a varied product mix.

(True/False)
4.8/5
(44)

Utilization of the total "cube" is the dominant consideration in office layout.

(True/False)
4.8/5
(38)

A good layout requires determining:

(Multiple Choice)
4.9/5
(32)

The ________ layout's main objective is to equalize the task time for each station.

(Multiple Choice)
4.8/5
(40)

A firm is planning to set up an assembly line to assemble 40 units per hour,and 57 minutes per hour are productive.The time to perform each task and the tasks that precede each task are contained in the following table. A firm is planning to set up an assembly line to assemble 40 units per hour,and 57 minutes per hour are productive.The time to perform each task and the tasks that precede each task are contained in the following table.    (a)Draw a network diagram of precedence relationships. (b)Compute the required cycle time per unit in minutes. (c)Compute the theoretical minimum number of workstations required to produce 40 units per hour. (d)Balance this line using the longest processing time heuristic. (e)What is the efficiency of the line obtained in part d? (a)Draw a network diagram of precedence relationships. (b)Compute the required cycle time per unit in minutes. (c)Compute the theoretical minimum number of workstations required to produce 40 units per hour. (d)Balance this line using the longest processing time heuristic. (e)What is the efficiency of the line obtained in part d?

(Essay)
4.8/5
(42)

A(n)________ groups workers,their equipment,and spaces/offices to provide for comfort,safety,and movement of information.

(Essay)
4.8/5
(36)

________ is the maximum time that the product is allowed at each workstation.

(Essay)
4.9/5
(45)

The fixed-position layout would be MOST appropriate in which of the following settings?

(Multiple Choice)
4.9/5
(40)
Showing 41 - 60 of 146
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)