Exam 19: Statistical Process Control
Exam 1: Operations and Productivity127 Questions
Exam 2: Operations Strategy in a Global Environment119 Questions
Exam 3: Project Management120 Questions
Exam 4: Forecasting141 Questions
Exam 5: Design of Goods and Services118 Questions
Exam 6: Managing Quality127 Questions
Exam 7: Process Strategy108 Questions
Exam 8: Location Strategies120 Questions
Exam 9: Layout Strategies145 Questions
Exam 10: Human Resources,job Design,and Work Measurement154 Questions
Exam 11: Supply Chain Management145 Questions
Exam 12: Inventory Management163 Questions
Exam 13: Aggregate Planning and Sop116 Questions
Exam 14: Material Requirements Planning Mrpand Erp116 Questions
Exam 15: Short-Term Scheduling115 Questions
Exam 16: Jit,tps,and Lean Operations115 Questions
Exam 17: Maintenance and Reliability111 Questions
Exam 18: Sustainability in the Supply Chain80 Questions
Exam 19: Statistical Process Control144 Questions
Exam 20: Capacity and Constraint Management96 Questions
Exam 21: Supply Chain Management Analytics55 Questions
Exam 22: Decision-Making Tools96 Questions
Exam 23: Linear Programming88 Questions
Exam 24: Transportation Models89 Questions
Exam 25: Waiting-Line Models119 Questions
Exam 26: Learning Curves110 Questions
Exam 27: Simulation74 Questions
Select questions type
What is the statistical process chart used to control the number of defects per unit of output?
(Multiple Choice)
4.8/5
(30)
The mean and standard deviations for a process are μ = 90 and σ = 9,respectively.For the variable control chart,a sample size of 16 will be used.Calculate the standard deviation of the sample means.
(Essay)
4.8/5
(44)
At your first job out of college you have been assigned to the production of bottled 20 oz.soda.
The process has upper and lower spec limits of 20.5 and 19.5 oz,respectively,with a mean of 19.8 oz
and standard deviation of .1 oz.Your manager has requested the process produce no more than 3.4
defects per 1 million bottles produced.Calculate Cpk and then determine if the process is capable according to the manager's standard.
(Essay)
5.0/5
(39)
A manager wishes to build a 3-sigma range chart for a process.The sample size is five,the mean of sample means is 16.01,and the average range is 5.3.From Table S6.1,the appropriate value of D3 is 0,and D4 is 2.115.What are the UCL and LCL,respectively,for this range chart?
(Multiple Choice)
4.8/5
(37)
A process is said to be in statistical control when assignable causes are the only sources of variation.
(True/False)
4.8/5
(32)
The width of a bronze bar is intended to be one-eighth of an inch (0.125 inches).Inspection samples contain five bars each.The average range of these samples is 0.01 inches.What are the upper and lower control limits for the x-bar and R-chart for this process,using 3-sigma limits?
(Essay)
4.8/5
(32)
Which of the following is true regarding the process capability index Cpk?
(Multiple Choice)
4.8/5
(35)
To measure the voltage of batteries,one would sample by attributes.
(True/False)
5.0/5
(41)
A city police chief decides to do an annual review of the police department by checking the number of monthly complaints.If the total number of complaints in each of the 12 months were 15,18,13,12,16,20,5,10,9,11,8,and 3 and the police chief wants a 90% confidence level,are the complaints in control?
(Essay)
4.8/5
(37)
________ is a method of measuring samples of lots or batches of product against predetermined standards.
(Essay)
4.9/5
(32)
Pierre's Motorized Pirogues and Mudboats is setting up an acceptance sampling plan for the special air cleaners he manufactures for his boats.His specifications,and the resulting plan,are shown on the POM for Windows output below.Pierre wants acceptance sampling to remove ALL defects from his production of air cleaners.Explain carefully why this won't happen. 

(Essay)
4.7/5
(31)
A c-chart is appropriate to plot the number of flaws in a bolt of fabric.
(True/False)
5.0/5
(41)
A Cp value of 1.33 indicates a standard of how many standard deviations (sigmas)?
(Multiple Choice)
4.8/5
(39)
A Cpk index greater than ________ is a capable process,one that generates fewer than 2.7 defects per 1000 at the ±3σ level.
(Essay)
4.8/5
(27)
Plots of sample ranges indicate that the most recent value is below the lower control limit.What course of action would you recommend?
(Multiple Choice)
4.9/5
(46)
Cartons of Plaster of Paris are supposed to weigh exactly 32 oz.Inspectors want to develop process control charts.They take ten samples of six boxes each and weigh them.Based on the following data,compute the lower and upper control limits and determine whether the process is in control.


(Essay)
4.8/5
(44)
A manager wants to build 3-sigma x-bar control limits for a process.The target value for the mean of the process is 10 units,and the standard deviation of the process is 6.If samples of size 9 are to be taken,what will be the upper and lower control limits,respectively?
(Multiple Choice)
4.8/5
(35)
The specifications for a manifold gasket that installs between two engine parts calls for a thickness of 2.500 mm ± .020 mm.The standard deviation of the process is estimated to be 0.004 mm.The process is currently operating at a mean thickness of 2.50 mm.(a)What are the upper and lower specification limits for this product? (b)What is the Cp for this process? (c)About what percent of all units of this gasket will meet specifications? Does this meet the technical definition of Six Sigma?
(Essay)
4.9/5
(41)
Showing 61 - 80 of 144
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)