Activity R on a CPM network has predecessors M and N,and has successor S.R has duration 5.N's late finish is 18,while M's is 20.S's late start is 14.Which of the following is definitely true?

(Multiple Choice)
4.9/5
(41)

PERT calculations typically include the duration variance of each activity.What is the purpose of this calculation,i.e.what's the role of variances in PERT analysis?

(Essay)
4.8/5
(46)

The critical path can be determined by use of either the "forward pass" or the "backward pass."

(True/False)
4.7/5
(41)

An activity on a PERT network has these time estimates: optimistic = 1,most likely = 2,and pessimistic = 5.What is its expected activity time?

(Multiple Choice)
4.8/5
(40)

The critical path for the network activities shown below is ________ with duration ________. The critical path for the network activities shown below is ________ with duration ________.

(Multiple Choice)
4.8/5
(41)

If an activity whose normal duration is 13 days can be shortened to 10 days for an added cost of $1,500,what is the crash cost per period?

(Multiple Choice)
4.8/5
(38)

Two critical path activities are candidates for crashing on a CPM network.Activity details are in the table below.To cut one day from the project's duration,activity ________ should be crashed first,adding ________ to project cost. Two critical path activities are candidates for crashing on a CPM network.Activity details are in the table below.To cut one day from the project's duration,activity ________ should be crashed first,adding ________ to project cost.

(Multiple Choice)
4.9/5
(40)

Two critical path activities are candidates for crashing on a CPM network.Activity details are in the table below.To cut one day from the project's duration,activity ________ should be crashed first,adding ________ to project cost. Two critical path activities are candidates for crashing on a CPM network.Activity details are in the table below.To cut one day from the project's duration,activity ________ should be crashed first,adding ________ to project cost.

(Multiple Choice)
4.7/5
(33)

What is the basic difference between PERT and CPM?

(Essay)
4.8/5
(34)

If an activity whose normal duration is 15 days can be shortened to 10 days for an added cost of $2,000,what is the crash cost per period?

(Multiple Choice)
4.8/5
(32)

The critical path for the network activities shown below is ________ with duration ________. The critical path for the network activities shown below is ________ with duration ________.

(Multiple Choice)
4.8/5
(33)

Which of the following is NOT performed by Microsoft Project?

(Multiple Choice)
5.0/5
(31)

The difference between AON and AOA networks is that:

(Multiple Choice)
4.7/5
(43)

Which of the following statements concerning CPM activities is false?

(Multiple Choice)
4.9/5
(40)

Shortening the project's duration by deleting unnecessary activities is called "project crashing."

(True/False)
4.9/5
(40)

A project organization:

(Multiple Choice)
4.8/5
(32)

A project being analyzed by PERT has 38 activities,16 of which are on the critical path.If the estimated time along the critical path is 90 days with a project variance of 25,what is the probability that the project will be completed in 88 days or less?

(Multiple Choice)
4.9/5
(43)

A(n)________ divides a project into more and more detailed components.

(Essay)
4.9/5
(36)

The standard deviation of project duration is the average of the standard deviation of all activities on the critical path.

(True/False)
4.7/5
(27)

Which of the following statements regarding time-cost tradeoffs in CPM networks is false?

(Multiple Choice)
4.8/5
(44)
Showing 41 - 60 of 120