Exam 2: Process Strategy and Analysis

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

________ involves estimating the proportion of time spent by people and machines on activities, based on a large number of observations.

(Short Answer)
4.8/5
(37)

Gaps between actual and desired performance are called ________.

(Short Answer)
4.9/5
(39)

A process troubleshooter has to decide which problem to address first with his or her cause-and-effect diagram. The data analysis tool that will help him decide which problem to tackle first is a:

(Multiple Choice)
4.8/5
(41)

A professor can grade a quiz in 2 minutes. Over the course of an academic year he has 6 sections of a course with an average of 25 students with 10 quizzes in each section. If he is paid $40 an hour, how much is his annual quiz-grading labor cost to the university?

(Multiple Choice)
4.9/5
(34)

People processing services require:

(Multiple Choice)
5.0/5
(31)

A work sampling method is used to determine the proportion of the time a worker is idle. The following information was gathered on a random basis. A work sampling method is used to determine the proportion of the time a worker is idle. The following information was gathered on a random basis.   What is the proportion of idle time observed for this worker? What is the proportion of idle time observed for this worker?

(Multiple Choice)
4.8/5
(32)

Service providers with a line process tend to move customers, materials, or information in a fixed sequence from one operation to the next.

(True/False)
4.8/5
(39)

More often than not, process improvement takes place whether or not a process is reengineered.

(True/False)
4.8/5
(39)

Scenario 2.6 You currently purchase a part used in your production process from an outside supplier, and have decided to begin making this part in-house. You have two equipment options for moving production in-house: special-purpose equipment and general-purpose equipment. Cost information for these two options is as follows: Scenario 2.6 You currently purchase a part used in your production process from an outside supplier, and have decided to begin making this part in-house. You have two equipment options for moving production in-house: special-purpose equipment and general-purpose equipment. Cost information for these two options is as follows:    -Use Scenario 2.6 to answer this question. What are total costs under the Special-Purpose Equipment option for an annual quantity of 40,000 units? -Use Scenario 2.6 to answer this question. What are total costs under the Special-Purpose Equipment option for an annual quantity of 40,000 units?

(Multiple Choice)
4.9/5
(36)

A job process should be preferred when:

(Multiple Choice)
4.8/5
(43)

The general principle that 80% of a company's complaints are generated by 20% of its product or service issues is known as the Pareto concept.

(True/False)
4.8/5
(36)

A(n) ________ would be a useful tool to determine the effect that the number of practice problems solved correctly has on the midterm score.

(Short Answer)
4.8/5
(42)

Customer involvement reflects the ways in which customers become part of the process and the extent of their participation.

(True/False)
4.8/5
(36)

The authors list six key elements of reengineering. Pick any three and describe their contribution to the reengineering effort.

(Essay)
4.8/5
(34)

Scenario 2.6 You currently purchase a part used in your production process from an outside supplier, and have decided to begin making this part in-house. You have two equipment options for moving production in-house: special-purpose equipment and general-purpose equipment. Cost information for these two options is as follows: Scenario 2.6 You currently purchase a part used in your production process from an outside supplier, and have decided to begin making this part in-house. You have two equipment options for moving production in-house: special-purpose equipment and general-purpose equipment. Cost information for these two options is as follows:    -Use Scenario 2.6 to answer this question. What is the break even quantity between the two options? -Use Scenario 2.6 to answer this question. What is the break even quantity between the two options?

(Multiple Choice)
4.9/5
(39)

________ is the mix of equipment and human skills in a process.

(Short Answer)
4.9/5
(33)

Highly customized job processes and processes that are highly divergent require the use of:

(Multiple Choice)
4.8/5
(34)

The labor time for successive units produced is plotted in the graph shown below. What is the learning percentage reflected by this graph? The labor time for successive units produced is plotted in the graph shown below. What is the learning percentage reflected by this graph?

(Essay)
4.8/5
(39)

A job process has the highest level of customization of the process choices.

(True/False)
4.8/5
(34)

The learning curve for a process depends on the rate of learning and the actual or estimated time for the first unit processed.

(True/False)
4.7/5
(37)
Showing 41 - 60 of 239
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)