A(n) ________ addresses flow, allocates space, and responds to customer behavior.

(Short Answer)
4.9/5
(41)

You have been asked to balance a flow shop assembly operation to achieve an output rate of 120 units per eight-hour day. Task times and precedence relationships are shown in the table below. You have been asked to balance a flow shop assembly operation to achieve an output rate of 120 units per eight-hour day. Task times and precedence relationships are shown in the table below.    (a) Draw the precedence diagram. (b) Determine the desired cycle time. (c) Determine the theoretical minimum number of stations needed. (d) Balance this line using the fewest following tasks heuristic. (e) What is the efficiency of the line obtained in part d? (a) Draw the precedence diagram. (b) Determine the desired cycle time. (c) Determine the theoretical minimum number of stations needed. (d) Balance this line using the fewest following tasks heuristic. (e) What is the efficiency of the line obtained in part d?

(Essay)
4.9/5
(37)

A big advantage of a process-oriented layout is:

(Multiple Choice)
4.8/5
(35)

A process-oriented layout is the traditional way to support a product differentiation strategy.

(True/False)
4.8/5
(43)

With accurate records, random stocking systems can increase facility utilization and decrease labor cost.

(True/False)
4.7/5
(43)

What is a servicescape? How is it related to the retail layout problem? What are the three elements of servicescape for dealing with these human issues?

(Essay)
4.9/5
(29)

For which of the following operations would a fixed-position layout be MOST appropriate?

(Multiple Choice)
5.0/5
(46)

If a layout problem is solved by use of heuristics, this means that:

(Multiple Choice)
4.9/5
(32)

The data below represent time study observations for an assembly operation. Assume a 7% allowance factor. What is the normal time for element 2? The data below represent time study observations for an assembly operation. Assume a 7% allowance factor. What is the normal time for element 2?

(Multiple Choice)
4.8/5
(37)

________ is an approach that specifies the tasks that constitute a job for an individual or a group.

(Short Answer)
4.7/5
(35)

Which of the following statements describes job rotation?

(Multiple Choice)
4.8/5
(51)

Identify the five common layout heuristics used to assign tasks to workstations in assembly-line balancing.

(Essay)
4.8/5
(43)

The accuracy of a labor standard is to be within ± 5%, and the confidence level is 95%. The standard deviation of the sample is 2 and the mean is 9.5. What sample size should be used?

(Multiple Choice)
4.7/5
(37)

A brake system installer in an auto factory has an actual average time of 125 minutes on her task. The performance rating of the worker timed was estimated at 110%. Practice in this department is to allow 7% for allowances. (a) Find the normal time for the operation. (b) Compute the standard time for the operation.

(Essay)
4.7/5
(38)

The 50th percentile female is 62.9 inches tall and should have a chair:

(Multiple Choice)
4.8/5
(40)

Which of the following terms implies an increase in responsibility and control in the vertical direction?

(Multiple Choice)
4.8/5
(33)

What is mutual trust? What is its link to a firm's human resource strategy?

(Essay)
4.7/5
(33)

Suppose that the allowance factor for a job is 0.5 and the normal time is 4 hours. What is the standard time?

(Multiple Choice)
4.8/5
(46)

Cyclone Appliances has developed a new European-style convection oven that will be made on an assembly line. The schedule requires 100 ovens in an 8-hour day. The assembly includes seven tasks. The table below indicates the performance time and the sequence requirements for each task. Cyclone Appliances has developed a new European-style convection oven that will be made on an assembly line. The schedule requires 100 ovens in an 8-hour day. The assembly includes seven tasks. The table below indicates the performance time and the sequence requirements for each task.    (a) What is the cycle time for this assembly operation? (b) What is the theoretical minimum number of workstations? (c) Draw the precedence diagram. (a) What is the cycle time for this assembly operation? (b) What is the theoretical minimum number of workstations? (c) Draw the precedence diagram.

(Essay)
4.9/5
(44)

Methods analysis focuses on:

(Multiple Choice)
4.8/5