Exam 9: Human Resources, Job Design, and Work Measurement
Exam 1: Operations and Productivity138 Questions
Exam 2: Operations Strategy in a Global Environment134 Questions
Exam 3: Project Management131 Questions
Exam 4: Forecasting148 Questions
Exam 5: Design of Goods and Services126 Questions
Exam 6: Managing Quality226 Questions
Exam 7: Process Strategies259 Questions
Exam 8: Location Strategies233 Questions
Exam 9: Human Resources, Job Design, and Work Measurement321 Questions
Exam 10: Supply Chain Management158 Questions
Exam 11: Inventory Management230 Questions
Exam 12: Aggregate Planning and Sop122 Questions
Exam 13: Material Requirements Planning Mrp and Erp133 Questions
Exam 14: Short-Term Scheduling124 Questions
Exam 15: Lean Operations122 Questions
Exam 16: Maintenance and Reliability119 Questions
Exam 17: Decision-Making Tools101 Questions
Exam 18: Linear Programming102 Questions
Exam 19: Transportation Models92 Questions
Exam 20: Waiting-Line Models126 Questions
Exam 21: Learning Curves114 Questions
Exam 22: Simulation78 Questions
Exam 23: Applying Analytics to Big Data in Operations Management61 Questions
Select questions type
Which of the following is a common heuristic for assembly line balancing?
(Multiple Choice)
4.9/5
(37)
In a product-oriented layout, what is the process of deciding how to assign tasks to workstations?
(Multiple Choice)
4.9/5
(34)
A product-oriented layout would be MOST appropriate for which one of the following businesses?
(Multiple Choice)
4.8/5
(40)
The major problem addressed by the process-oriented layout strategy is:
(Multiple Choice)
4.9/5
(35)
A(n) ________ involves timing a sample of a worker's performance and using it as a basis for setting a standard time.
(Short Answer)
4.8/5
(40)
An operations chart analyzes the simultaneous activities of two operators.
(True/False)
4.9/5
(38)
Which type of layout features departments or other functional groupings in which similar activities are performed?
(Multiple Choice)
4.8/5
(40)
A restaurant manager wants to determine the percent of time the servers are working and idle using work sampling. His calculation shows that he needs to take a sample of 100 based on a z value of 2. If he wants to use a z value of 3, how many more samples does he need to take?
(Multiple Choice)
4.9/5
(41)
The layout approach that addresses trade-offs between space and material handling is called the fixed-position layout.
(True/False)
4.9/5
(38)
Two uses of labor standards are to determine the labor content of items produced and to determine staffing needs.
(True/False)
4.7/5
(34)
When work sampling is performed to establish delay allowances, it is sometimes called a(n) ________.
(Short Answer)
4.7/5
(39)
Servicescape refers to the physical surrounding in which the service is delivered.
(True/False)
4.7/5
(26)
Which of these is the most common predetermined time standard?
(Multiple Choice)
4.8/5
(29)
In a time study, what is the required sample size to be 99% confident that the observed average time is within ± 3% of the actual value, if the process has a standard deviation of 1 minute and mean of 21 minutes?
(Essay)
4.9/5
(42)
The two extremes of employment stability policy are "follow demand exactly" and "keep demand constant."
(True/False)
4.9/5
(43)
What are the advantages and the disadvantages of the employment-stability policy of "hold employment constant?"
(Essay)
4.8/5
(39)
Showing 161 - 180 of 321
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)