Exam 3: Quality and Performance
Exam 1: Using Operations to Create Value100 Questions
Exam 2: Process Strategy and Analysis245 Questions
Exam 3: Quality and Performance195 Questions
Exam 4: Capacity Planning108 Questions
Exam 5: Constraint Management136 Questions
Exam 6: Lean Systems164 Questions
Exam 7: Project Management140 Questions
Exam 8: Forecasting150 Questions
Exam 9: Inventory Management207 Questions
Exam 10: Operations Planning and Scheduling149 Questions
Exam 11: Resource Planning125 Questions
Exam 12: Supply Chain Design77 Questions
Exam 13: Supply Chain Logistic Networks114 Questions
Exam 14: Supply Chain Integration111 Questions
Exam 15: Supply Chain Sustainability73 Questions
Exam 16: Decision Making107 Questions
Exam 17: Waiting Lines108 Questions
Exam 18: Special Inventory Models53 Questions
Exam 19: Linear Programming86 Questions
Exam 20: Simulation54 Questions
Exam 21: Financial Analysis55 Questions
Exam 22: Acceptance Sampling Plans87 Questions
Exam 23: Measuring Output Rates106 Questions
Exam 24: Learning Curve Analysis51 Questions
Exam 25: Operations Scheduling120 Questions
Exam 26: Layout36 Questions
Select questions type
The notion of internal customers applies to all parts of a firm.
(True/False)
4.9/5
(31)
Which alternative will increase the probability of detecting a shift in the process average?
(Multiple Choice)
4.7/5
(36)
One of the main challenges in developing the proper culture for TQM is to:
(Multiple Choice)
4.7/5
(41)
A laser eye surgery process has tolerances of plus or minus .001 inches.What does the process standard deviation need to be in order for this process to have a capability ratio of 1.33?
(Multiple Choice)
4.9/5
(28)
The customer's assessment of quality with reference to the price paid for the good or service is known as ________.
(Essay)
4.9/5
(34)
The defect rate for a product has historically been about 7.0%.What is the upper control chart limit if you wish to use a sample size of 20 and 3-sigma limits?
(Multiple Choice)
4.9/5
(43)
The 15-year-old car didn't dazzle students or members of the opposite sex,but it started every morning and evening and got the professor to his destination on time,thereby scoring high on the:
(Multiple Choice)
4.9/5
(41)
Table 5.11
Factors for Calculating Three-Sigma Limits for the
Chart and R-Chart
Source: 1950 ASTM Manual on Quality Control of Materials,copyright American Society for Testing Materials.Reprinted with permission.
-Thermostats are subjected to rigorous testing before they are shipped to air conditioning technicians around the world.Results from the last five samples are shown in the table.Calculate control limits for a chart that will monitor performance to target.The correct control limits as (LCL,UCL)are: 



(Multiple Choice)
4.9/5
(37)
A company is interested in monitoring the variability in the weight of the fertilizer bags it produces.An appropriate control chart would be:
(Multiple Choice)
4.9/5
(32)
A sampling plan is best for evaluating quality when: (1)Inspection costs are high
(2)Inspection costs are low
(3)Non-destructive testing is available
(4)Destructive testing is required
(Multiple Choice)
4.9/5
(40)
A firm targeting Six Sigma quality will use a process capability ratio of ________ as their goal.
(Essay)
4.9/5
(42)
A hotel tracks the number of complaints per month.When the process is in control,there is an average of 35 complaints per month.Assume that a 2-sigma control limit is used.The next four months have 33,27,29,and 43 complaints.What should management do?
(Multiple Choice)
4.8/5
(38)
A(n)________ specifies the sample size,the time between successive samples,and decision rules that determine when action should be taken.
(Essay)
4.9/5
(34)
The Baldrige Performance Excellence Program is administered by:
(Multiple Choice)
4.8/5
(41)
The upper and lower specification limits for a component are 3.98 and 4.02 inches,respectively.The process standard deviation is .004,and the process average is 4.005 inches.Is this process capable of achieving four-sigma performance (the four-sigma performance target value is 1.33)?
(Essay)
4.9/5
(41)
Table 5.4
The manager of Champion Cooling Company has recently implemented a statistical process control method.The accompanying table shows the results of five different samples of walk-in coolers that were produced in the previous month.
-Use the information in Table 5.4.The first point plotted on the x-bar chart has a value of:

(Multiple Choice)
4.7/5
(43)
________ is a comprehensive and flexible system for achieving,sustaining,and maximizing business success through intensive data analysis and process management,improvement and reengineering.
(Essay)
4.8/5
(41)
When errors have been made while producing a product such that the item must be discarded,the resultant cost is called a(n):