Exam 16: Jit and Lean Operations
Exam 1: Operations and Productivity126 Questions
Exam 2: Operations Strategy in a Global Environment135 Questions
Exam 3: Project Management121 Questions
Exam 4: Forecasting144 Questions
Exam 5: Sustainability in the Supply Chain and Design of Goods and Services137 Questions
Exam 6: Managing Quality129 Questions
Exam 7: Process Strategy and Sustainability131 Questions
Exam 8: Location Strategies139 Questions
Exam 9: Layout Strategies161 Questions
Exam 10: Human Resources,job Design,and Work Measurement192 Questions
Exam 11: Supply-Chain Management145 Questions
Exam 12: Inventory Management168 Questions
Exam 13: Aggregate Planning134 Questions
Exam 14: Material Requirements Planning Mrpand ERP169 Questions
Exam 15: Short-Term Scheduling139 Questions
Exam 16: Jit and Lean Operations137 Questions
Exam 17: Maintenance and Reliability130 Questions
Exam 18: Statistical Process Control156 Questions
Exam 19: Capacity and Constraint Management107 Questions
Exam 20: Supply Chain Management Analytics55 Questions
Exam 21: Decision-Making Tools97 Questions
Exam 22: Linear Programming100 Questions
Exam 23: Transportation Models94 Questions
Exam 24: Waiting-Line Models135 Questions
Exam 25: Learning Curves111 Questions
Exam 26: Simulation92 Questions
Select questions type
You have read that in JIT and lean production the optimum lot size is one,with some exceptions for packaging and physical limitations.If a product currently has a lot size of 25,what must happen to setup time for the lot size to truly fall to one? Data for this problem are D= 100 units,S = $75 based on setup time of 50 minutes at $1.50 per minute,and H = $40 per unit per year.
(Essay)
4.9/5
(45)
A(n)________ is a JIT concept that results in material being produced only when requested and moved to where it is needed just as it is needed.
(Essay)
5.0/5
(33)
A grocery store is attempting to implement a kanban system.Which of the following would not be an application of kanbans?
(Multiple Choice)
4.8/5
(43)
The 5Ss-sort/segregate,simplify/straighten,shine/sweep,standardize,and sustain/self discipline-are important to lean production because they act as a means to reduce waste.
(True/False)
4.8/5
(30)
Which of the following is not an attribute of lean operations?
(Multiple Choice)
4.7/5
(35)
A bakery uses 5 containers that each hold 5 cakes.If daily demand is 20 cakes and lead time is 1 day determine the safety stock.
(Essay)
4.8/5
(30)
Handling material more than once is an example of the waste called ________.
(Essay)
4.8/5
(22)
Which one of the following is a characteristic of a JIT partnership?
(Multiple Choice)
4.9/5
(41)
Which of the following statements regarding JIT in services is true?
(Multiple Choice)
4.8/5
(29)
In the quest for competitive advantage,which of the following is a JIT requirement?
(Multiple Choice)
4.9/5
(34)
Daily usage of a part is 20 in a facility that operates 250 days of the year.Setup cost is $20 and annualized carrying cost is $210.Production of this part occurs at the rate of 50 per day when production of the part is underway.Lead time is 1 day;safety stock is
day's production.What is the optimum kanban size,and number of kanbans?

(Essay)
4.8/5
(33)
Great Lakes Barge and Baggage Company makes,among other things,battery-operated bilge pumps.Which of the following activities is not part of JIT? They
(Multiple Choice)
4.8/5
(34)
________ is the Japanese word for card that has come to mean "signal."
(Essay)
4.9/5
(32)
A characteristic of JIT partnerships with respect to quality is to
(Multiple Choice)
4.7/5
(40)
Product storage is an example of waste,in the sense that no value is added.
(True/False)
4.9/5
(45)
Hidden problems are generally uncovered during the process of reducing inventory.
(True/False)
4.8/5
(26)
Showing 61 - 80 of 137
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)