Exam 16: Jit and Lean Operations
Exam 1: Operations and Productivity126 Questions
Exam 2: Operations Strategy in a Global Environment135 Questions
Exam 3: Project Management121 Questions
Exam 4: Forecasting144 Questions
Exam 5: Sustainability in the Supply Chain and Design of Goods and Services137 Questions
Exam 6: Managing Quality129 Questions
Exam 7: Process Strategy and Sustainability131 Questions
Exam 8: Location Strategies139 Questions
Exam 9: Layout Strategies161 Questions
Exam 10: Human Resources,job Design,and Work Measurement192 Questions
Exam 11: Supply-Chain Management145 Questions
Exam 12: Inventory Management168 Questions
Exam 13: Aggregate Planning134 Questions
Exam 14: Material Requirements Planning Mrpand ERP169 Questions
Exam 15: Short-Term Scheduling139 Questions
Exam 16: Jit and Lean Operations137 Questions
Exam 17: Maintenance and Reliability130 Questions
Exam 18: Statistical Process Control156 Questions
Exam 19: Capacity and Constraint Management107 Questions
Exam 20: Supply Chain Management Analytics55 Questions
Exam 21: Decision-Making Tools97 Questions
Exam 22: Linear Programming100 Questions
Exam 23: Transportation Models94 Questions
Exam 24: Waiting-Line Models135 Questions
Exam 25: Learning Curves111 Questions
Exam 26: Simulation92 Questions
Select questions type
What are the 5Ss? Why does the list of the 5Ss sometimes have seven elements?
(Essay)
4.7/5
(26)
Which one of the following statements is true about the kanban system?
(Multiple Choice)
4.8/5
(36)
Because most services cannot be inventoried,there is little place for JIT to help service organizations achieve competitive advantage.
(True/False)
4.8/5
(37)
The ________ is the time between the arrival of raw materials and the shipping of finished products.
(Essay)
4.9/5
(32)
A certain product has been effectively managed in the past,according to its managers.The previous technique used the economic production quantity model,and resulted in an optimum lot size of 100.For this product,setup time is directly proportional to setup cost,and setup time is currently 40 minutes per batch.How much must setup time decline in order for the lot size to fall to 50 units? 25 units? 10 units?
(Essay)
4.9/5
(39)
One goal of JIT partnerships is the removal of in-plant inventory by delivery in small lots directly to the using department as needed.
(True/False)
4.8/5
(33)
The main focus of JIT efforts to reduce investment in inventory requires ________.
(Essay)
4.9/5
(38)
JIT suppliers have concerns that the JIT firm's demands for small lot sizes are simply a way of transferring holding cost from manufacturer firm to the supplier firm.
(True/False)
4.7/5
(31)
Excess bags of basic commodities such as flour and sugar that are stored in a restaurant's kitchen represent which of the following wastes?
(Multiple Choice)
4.9/5
(38)
Which of the following is true regarding the steps to reducing setup times?
(Multiple Choice)
4.7/5
(30)
The 5S term ________ includes analysis to improve workflow and reduce wasted motion.
(Essay)
4.8/5
(31)