________ allows manufacturing work cells and offices to be easily rearranged.

(Essay)
4.9/5
(36)

Lean operations are known for their

(Multiple Choice)
4.9/5
(29)

What is a kanban?

(Essay)
4.8/5
(41)

Which one of the following is not a requirement of JIT systems?

(Multiple Choice)
4.9/5
(32)

Identify sources of variability.

(Essay)
4.8/5
(29)

Reduction of in-transit inventory can be encouraged through use of

(Multiple Choice)
4.9/5
(34)

TPS stands for Total Production Streamlining.

(True/False)
4.7/5
(35)

In a JIT system,product inspection adds value by identifying defective items.

(True/False)
4.8/5
(34)

Cross-training is a common JIT tactic to improve flexibility.

(True/False)
4.9/5
(32)

Just-in-time systems make demands on layouts,including

(Multiple Choice)
4.9/5
(38)

If a casual-dining restaurant is attempting to practice JIT and lean operations,which of the following would not be present?

(Multiple Choice)
4.8/5
(36)

Characteristics of just-in-time partnerships do not include

(Multiple Choice)
4.7/5
(37)

Which of the following is not a goal of JIT partnerships?

(Multiple Choice)
4.8/5
(32)

A repetitive manufacturing firm is planning on level material use.The following information has been collected.Currently,the firm operates 250 days per year. A repetitive manufacturing firm is planning on level material use.The following information has been collected.Currently,the firm operates 250 days per year.    a.What is the setup cost,based on the desired lot size? b.What is the setup time,based on $40 per hour setup labor? a.What is the setup cost,based on the desired lot size? b.What is the setup time,based on $40 per hour setup labor?

(Essay)
4.8/5
(29)

Daily usage of an assembly is 100 in a facility that operates 300 days of the year.Setup cost is $5 and annualized carrying cost is $160.Production of this assembly occurs at the rate of 400 per day when production of the assembly is underway.Lead time is 3 days;safety stock is Daily usage of an assembly is 100 in a facility that operates 300 days of the year.Setup cost is $5 and annualized carrying cost is $160.Production of this assembly occurs at the rate of 400 per day when production of the assembly is underway.Lead time is 3 days;safety stock is   day's production.What is the optimum kanban size,and number of kanbans? day's production.What is the optimum kanban size,and number of kanbans?

(Essay)
4.8/5
(30)

Which one of the following scenarios represents the use of a kanban to reduce inventories?

(Multiple Choice)
4.8/5
(39)

Which of the following is specifically characterized by the elimination of waste through a focus on exactly what the customer wants?

(Multiple Choice)
4.7/5
(30)

Customer demand will always remain an unknown,so it is not considered a source of variation.

(True/False)
4.7/5
(31)

________ involves scheduling products so that each day's production meets the demand for that day.

(Essay)
4.8/5
(40)

Which one of the following is not a layout tactic in a JIT environment?

(Multiple Choice)