Exam 5: Estimating Project Times and Costs
Exam 1: Modern Project Management88 Questions
Exam 2: Organization Strategy and Project Selection88 Questions
Exam 3: Organization: Structure and Culture94 Questions
Exam 4: Defining the Project89 Questions
Exam 5: Estimating Project Times and Costs91 Questions
Exam 6: Developing a Project Plan94 Questions
Exam 7: Managing Risk87 Questions
Exam 8: Scheduling Resources and Costs90 Questions
Exam 9: Reducing Project Duration94 Questions
Exam 10: Leadership: Being an Effective Project Manager88 Questions
Exam 11: Managing Project Teams94 Questions
Exam 12: Outsourcing: Managing Interorganizational Relations94 Questions
Exam 13: Progress and Performance Measurement and Evaluation88 Questions
Exam 14: Project Closure88 Questions
Exam 15: International Projects94 Questions
Exam 16: Oversight86 Questions
Exam 17: An Introduction to Agile Project Management85 Questions
Exam 18: Project Management Career Paths35 Questions
Select questions type
If a project is internal to the company and relatively small, the bottom-up approach to estimating time and costs for the project is the best choice.
(True/False)
4.8/5
(39)
The prevailing belief in some firms that detailed estimating takes too much time and is not worth the effort or that it is impossible to predict the future is an example of the ________ factor.
(Short Answer)
4.9/5
(38)
People working on prototype development needing time to interact with the design engineers after the design is completed is an example of:
(Multiple Choice)
4.9/5
(40)
Which of the following is not one of the factors that need to be considered to improve quality of estimates for project times and costs?
(Multiple Choice)
5.0/5
(26)
The accuracy of top-down estimates will typically be in the range of
(Multiple Choice)
5.0/5
(37)
______ estimates are most likely to use low cost, efficient methods.
(Multiple Choice)
4.8/5
(42)
In the ________ method of top-down estimating, a quantitative relationship is established between the estimates and a project parameter.
(Short Answer)
4.7/5
(41)
The estimating factor known as ________ considers the decreasing accuracy of estimates as one forecasts activities that are further into the future.
(Short Answer)
4.9/5
(42)
Design flaws being revealed after the fact, extreme weather conditions, and accidents occurring are examples of:
(Multiple Choice)
4.9/5
(34)
A typical statement in actual practice is that estimates should have a probability of being met ______ of the time.
(Multiple Choice)
4.8/5
(34)
The bottom-up approach for estimating times and costs that uses costs from past projects that were similar to the current project is known as:
(Multiple Choice)
5.0/5
(36)
The accuracy of bottom-up estimates will typically be in the range of
(Multiple Choice)
4.9/5
(37)
Bottom-up-estimating is another name for overzealous top management estimates.
(True/False)
5.0/5
(35)
Which of the following is not one of the recommended guidelines for developing useful work package estimates?
(Multiple Choice)
4.9/5
(29)
Identify the drawbacks to an excessive level of detail in project times and costs.
(Essay)
4.9/5
(30)
The Consensus method of estimating costs is a bottom-up technique.
(True/False)
4.7/5
(22)
Probably the most reliable method for estimating time and cost is to use the _______ and to ask the people responsible for the work package to make the estimates.
(Short Answer)
4.7/5
(34)
A manager getting further into a project and obtaining a better understanding of what needs to be done to accomplish a project is an example of:
(Multiple Choice)
4.9/5
(34)
Sean is forecasting the time and cost of developing a customized software program by looking at the number of inputs, outputs, inquires, files, and interfaces.Which of the following methods is he using?
(Multiple Choice)
4.8/5
(33)
Given that a project closely follows past projects in features and costs, the ________ method of assigns costs and times to particular phases that a project will go through.
(Short Answer)
4.8/5
(28)