Exam 13: Progress and Performance Measurement and Evaluation

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

n Earned Value System used to monitor project progress includes comparison of

(Multiple Choice)
4.9/5
(42)

Control is one of the most neglected areas of project management.

(True/False)
4.9/5
(33)

Of the following costs, which are not included in baseline?

(Multiple Choice)
4.7/5
(36)

The key to managing scope creep is change management.

(True/False)
4.9/5
(36)

An index value less than one indicates that the project is

(Multiple Choice)
4.9/5
(32)

Cost variance tells us if the ________ costs are more or less than was planned at any point over the life of the project.

(Short Answer)
4.9/5
(33)

The method most frequently used in measuring project progress is the

(Multiple Choice)
4.7/5
(31)

Cost variance tells us the different estimates among vendors needed to complete the project over the life of the project.

(True/False)
4.8/5
(38)

The units of measure for SV or CV is in terms of ________.

(Short Answer)
4.9/5
(36)

Identify and briefly discuss the two methods to revise estimates of future project costs.

(Essay)
4.8/5
(39)

The baseline is derived from merging information from the work packages with the project network.

(True/False)
4.8/5
(24)

________ is simply the percent complete, times the original budget.

(Short Answer)
4.9/5
(41)

Milestones are significant project events that mark major accomplishments.

(True/False)
4.8/5
(47)

The second step in the project control process of the measurement and evaluation of project performance is to:

(Multiple Choice)
4.8/5
(28)

The ________ is the rule most frequently used by practicing project managers to both assign costs to the baseline and to measure progress using earned value.

(Short Answer)
4.8/5
(39)

In monitoring project time (schedule) performance actual performance should be compared to:

(Multiple Choice)
4.9/5
(40)

Which of the following methods will measure the scheduling efficiency of the work accomplished to date?

(Multiple Choice)
4.8/5
(33)

Identify the steps in creating a control process that measure and evaluate project performance.

(Essay)
4.9/5
(33)

The PCIB index measures the project percent complete in relation to the resources that were budgeted.

(True/False)
4.8/5
(31)

A project monitoring system involves all of the following except:

(Multiple Choice)
4.8/5
(31)
Showing 61 - 80 of 88
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)